{"title":"Improved performance of the Munich MP tandem: A status report","authors":"H. Münzer, L. Rohrer, S.J. Skorka","doi":"10.1016/0029-554X(81)90853-3","DOIUrl":null,"url":null,"abstract":"<div><p>Operating experience and some of the modifications introduced during the last two years are reported. During the past year the terminal voltage obtained in test runs, the voltage used during experiments and the operating efficiency of the accelerator have improved considerably. The spectrum of ions available in routine operations has been extended to include <sup>14</sup>C, <sup>30</sup>Si, <sup>36</sup>S, <sup>48</sup>Ca and <sup>60</sup>Ni beams.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 87-91"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90853-3","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908533","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Operating experience and some of the modifications introduced during the last two years are reported. During the past year the terminal voltage obtained in test runs, the voltage used during experiments and the operating efficiency of the accelerator have improved considerably. The spectrum of ions available in routine operations has been extended to include 14C, 30Si, 36S, 48Ca and 60Ni beams.