E. Perez Ferreira, M.A.J. Mariscotti, E. Ventura, A. Ceballos, N. Fazzini, A. Filevich, H. González, R. Requejo, R. Ribarich, J.J. Rossi, E. Achterberg, D. Camin, J. Nicolai, S. Tau
{"title":"The argentine 20 MV tandem accelerator project","authors":"E. Perez Ferreira, M.A.J. Mariscotti, E. Ventura, A. Ceballos, N. Fazzini, A. Filevich, H. González, R. Requejo, R. Ribarich, J.J. Rossi, E. Achterberg, D. Camin, J. Nicolai, S. Tau","doi":"10.1016/0029-554X(81)90863-6","DOIUrl":null,"url":null,"abstract":"<div><p>A 20 MV tandem accelerator laboratory is currently under construction in Argentina. The facility is planned to be completed by the end of 1982.</p></div>","PeriodicalId":100971,"journal":{"name":"Nuclear Instruments and Methods","volume":"184 1","pages":"Pages 161-172"},"PeriodicalIF":0.0000,"publicationDate":"1981-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0029-554X(81)90863-6","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Nuclear Instruments and Methods","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0029554X81908636","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
A 20 MV tandem accelerator laboratory is currently under construction in Argentina. The facility is planned to be completed by the end of 1982.