Analysis on interacting of close-vertical underpass existing subway during construction

Duan Jian-hua, Song Wei-dong, Cong En-wei, Pan Tong-bin
{"title":"Analysis on interacting of close-vertical underpass existing subway during construction","authors":"Duan Jian-hua, Song Wei-dong, Cong En-wei, Pan Tong-bin","doi":"10.1109/ICETCE.2011.5774225","DOIUrl":null,"url":null,"abstract":"Close-vertical underpass existing subway is the hardest condition during civil subway construction. Taking Beijing Metro Line 10 vertical Underpass Metro line 1 as the project background, the paper focus on the interacting of the new building and existing tunnel during the whole construction process. Adopting Ansys and Flac-3d to build large-scale mathematical and physical artificial models, by the analysis of the new building and existing tunnel deformation and stress alteration we got the Mechanical Characteristic of the new and existing subway tunnel. The research indicates that the main affect range of the new tunnel construction to the old tunnel is mainly in double excavation scope (6m). The main characterizations of the existing tunnel include the liner stress decreased, incline and recover. The existing of metro line 1 takes block conductive effect to surrounding rock stress and deformation caused by excavation.","PeriodicalId":6340,"journal":{"name":"2011 International Conference on Electric Technology and Civil Engineering (ICETCE)","volume":"1 1","pages":"3875-3878"},"PeriodicalIF":0.0000,"publicationDate":"2011-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Electric Technology and Civil Engineering (ICETCE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICETCE.2011.5774225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Close-vertical underpass existing subway is the hardest condition during civil subway construction. Taking Beijing Metro Line 10 vertical Underpass Metro line 1 as the project background, the paper focus on the interacting of the new building and existing tunnel during the whole construction process. Adopting Ansys and Flac-3d to build large-scale mathematical and physical artificial models, by the analysis of the new building and existing tunnel deformation and stress alteration we got the Mechanical Characteristic of the new and existing subway tunnel. The research indicates that the main affect range of the new tunnel construction to the old tunnel is mainly in double excavation scope (6m). The main characterizations of the existing tunnel include the liner stress decreased, incline and recover. The existing of metro line 1 takes block conductive effect to surrounding rock stress and deformation caused by excavation.
既有地铁密立地下通道在施工过程中的相互作用分析
既有地下通道是民用地铁施工中最困难的条件。本文以北京地铁10号线地铁1号线垂直地下通道为工程背景,重点研究新建建筑与既有隧道在整个施工过程中的相互作用。采用Ansys和Flac-3d软件建立大尺度的数学和物理人工模型,通过对新建建筑和既有隧道的变形和应力变化进行分析,得出新建和既有地铁隧道的力学特性。研究表明,新隧道施工对老隧道的主要影响范围主要在双开挖范围(6m)内。既有隧道的主要特征是衬砌应力减小、倾斜和恢复。地铁1号线的存在对开挖引起的围岩应力和变形具有块传导作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信