Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing

IF 1.8 Q3 MANAGEMENT
Lucky Setiawan, S. Hasibuan
{"title":"Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing","authors":"Lucky Setiawan, S. Hasibuan","doi":"10.12776/qip.v25i2.1516","DOIUrl":null,"url":null,"abstract":"Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time.\nMethodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle.\nFindings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days.\nResearch Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process.\nOriginality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.","PeriodicalId":44057,"journal":{"name":"Quality Innovation Prosperity-Kvalita Inovacia Prosperita","volume":"130 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2021-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Innovation Prosperity-Kvalita Inovacia Prosperita","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12776/qip.v25i2.1516","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 2

Abstract

Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time. Methodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle. Findings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days. Research Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process. Originality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.
运用八项原则和精益生产提高某运动鞋工厂缝纫工艺的提升性能
目的:本研究旨在设计一种新型运动鞋的性能改善框架,以增加爬坡过程时间。方法论/方法:该方法使用了8个学科的问题解决系统、一分钟交换模、可视化管理和准时原则。研究结果:通过使用上述方法,研究结果将对公司产生积极影响。模型转换时间从600分钟减少到102分钟,爬坡时间从20天减少到2天。研究局限性/启示:本研究的局限性在于仅以CK2946模型作为个案研究。成本和其他抑制因素也没有包括在对这一增加过程的讨论中。论文的独创性/价值:通过整合SMED, Just In Time,视觉管理,并使用8-纪律,研究人员开发了一个提高性能的框架,以提高一种新型运动鞋的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.10
自引率
13.30%
发文量
16
审稿时长
6 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信