Prioritisation of operations during emergency shutdown of a crude distillation unit by interval-valued intuitionistic fuzzy analytic hierarchy process

IF 1.7 4区 工程技术 Q3 ENGINEERING, INDUSTRIAL
Gopalakrishnan Suresh, V. R. Renjith, Anchalassery Balakrishnan Bhasi
{"title":"Prioritisation of operations during emergency shutdown of a crude distillation unit by interval-valued intuitionistic fuzzy analytic hierarchy process","authors":"Gopalakrishnan Suresh, V. R. Renjith, Anchalassery Balakrishnan Bhasi","doi":"10.1177/1748006x231193476","DOIUrl":null,"url":null,"abstract":"A very reliable control system for offering a safety layer in emergency scenarios is an emergency shutdown system, or ESD system. It aids in preventing crises from having disastrous effects on the economy, the environment or business operations. In any plant, emergency shutdown systems reduce the risk of harm to the working population, the environment or equipment damage by guarding against leaks, hydrocarbon escapes, fire outbreaks and explosions. The ESD system halts process activity in an emergency, ensures that the hazard is isolated and does not worsen. It is essential that there is a clearly defined emergency procedure in place when a facility needs to be shut down in an emergency. When preparing an emergency procedure for use in an emergency, it is crucial to prioritise the operations. The factory uses an Interval-valued Intuitionistic Fuzzy Analytical Hierarchy Process (IVIFAHP) to prioritise activities in emergency situations. It is possible to design emergency shutdown systems using the aforementioned order of operations. It is possible to properly set up safety measures using the multi-criteria decision-making approach (MCDM). The Analytical Hierarchy Process (AHP) compares variables without taking measurement scales or units into consideration, which is a distinct benefit. The AHP’s handling of ambiguity, uncertainty and imprecise data is improved by the IVIFAHP.","PeriodicalId":51266,"journal":{"name":"Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability","volume":null,"pages":null},"PeriodicalIF":1.7000,"publicationDate":"2023-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Mechanical Engineers Part O-Journal of Risk and Reliability","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1177/1748006x231193476","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

Abstract

A very reliable control system for offering a safety layer in emergency scenarios is an emergency shutdown system, or ESD system. It aids in preventing crises from having disastrous effects on the economy, the environment or business operations. In any plant, emergency shutdown systems reduce the risk of harm to the working population, the environment or equipment damage by guarding against leaks, hydrocarbon escapes, fire outbreaks and explosions. The ESD system halts process activity in an emergency, ensures that the hazard is isolated and does not worsen. It is essential that there is a clearly defined emergency procedure in place when a facility needs to be shut down in an emergency. When preparing an emergency procedure for use in an emergency, it is crucial to prioritise the operations. The factory uses an Interval-valued Intuitionistic Fuzzy Analytical Hierarchy Process (IVIFAHP) to prioritise activities in emergency situations. It is possible to design emergency shutdown systems using the aforementioned order of operations. It is possible to properly set up safety measures using the multi-criteria decision-making approach (MCDM). The Analytical Hierarchy Process (AHP) compares variables without taking measurement scales or units into consideration, which is a distinct benefit. The AHP’s handling of ambiguity, uncertainty and imprecise data is improved by the IVIFAHP.
基于区间值直觉模糊层次分析法的原油蒸馏装置紧急停机作业优先排序
紧急关断系统(ESD)是一种非常可靠的控制系统,可以在紧急情况下提供安全层。它有助于防止危机对经济、环境或商业运作产生灾难性影响。在任何工厂,紧急停机系统通过防止泄漏、碳氢化合物泄漏、火灾爆发和爆炸来降低对工作人员、环境或设备损坏的危害风险。ESD系统在紧急情况下停止工艺活动,确保危险被隔离并且不会恶化。在紧急情况下需要关闭设施时,必须有一个明确界定的应急程序。在准备用于紧急情况的应急程序时,确定操作的优先次序至关重要。工厂使用区间值直觉模糊层次分析法(IVIFAHP)来确定紧急情况下活动的优先级。使用上述操作顺序设计紧急停机系统是可能的。使用多准则决策方法(MCDM)可以正确设置安全措施。层次分析法(AHP)在不考虑测量尺度或单位的情况下比较变量,这是一个明显的优点。AHP对模糊性、不确定性和不精确数据的处理得到了IVIFAHP的改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.50
自引率
19.00%
发文量
81
审稿时长
6-12 weeks
期刊介绍: The Journal of Risk and Reliability is for researchers and practitioners who are involved in the field of risk analysis and reliability engineering. The remit of the Journal covers concepts, theories, principles, approaches, methods and models for the proper understanding, assessment, characterisation and management of the risk and reliability of engineering systems. The journal welcomes papers which are based on mathematical and probabilistic analysis, simulation and/or optimisation, as well as works highlighting conceptual and managerial issues. Papers that provide perspectives on current practices and methods, and how to improve these, are also welcome
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信