Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang
{"title":"Slack Due-Window Assignment Scheduling Problem with Deterioration Effects and a Deteriorating Maintenance Activity","authors":"Xue Jia, Dan-Yang Lv, Yang Hu, Ji-Bo Wang, Zhi Wang, Ershen Wang","doi":"10.1142/s0217595922500051","DOIUrl":null,"url":null,"abstract":"This paper studies the slack due-window assignment scheduling problem with deterioration effects and a deterioration maintenance activity on a single-machine. The machine deteriorates during the machining process, and at a certain moment performs a deterioration maintenance activity, that is, the duration time of the maintenance activity is a linear function of the maintenance starting time. It is needed to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowances and the sequence of jobs to minimize the weighted penalties for the sum of earliness and tardiness, weighted number of early and delayed, and weighted due-window starting time and size. This paper proposes a polynomial time algorithm to solve this problem.","PeriodicalId":8478,"journal":{"name":"Asia Pac. J. Oper. Res.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asia Pac. J. Oper. Res.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1142/s0217595922500051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
This paper studies the slack due-window assignment scheduling problem with deterioration effects and a deterioration maintenance activity on a single-machine. The machine deteriorates during the machining process, and at a certain moment performs a deterioration maintenance activity, that is, the duration time of the maintenance activity is a linear function of the maintenance starting time. It is needed to make a decision on when to schedule the deteriorating maintenance activity, the optimal common flow allowances and the sequence of jobs to minimize the weighted penalties for the sum of earliness and tardiness, weighted number of early and delayed, and weighted due-window starting time and size. This paper proposes a polynomial time algorithm to solve this problem.