{"title":"ANALISIS PLTS ATAP 25 KWP ON GRID KANTOR DPRD PROVINSI BALI","authors":"I. K. Hendy Wijaya, I. N. Satya Kumara, W. G. Ariastina","doi":"10.24843/spektrum.2022.v09.i02.p15","DOIUrl":null,"url":null,"abstract":"Development to new renewable energy still lower than Indonesia's target of 23% in 2025. For this reason, alternative solutions are needed, namely the use of renewable energy, one of which is from the solar energy sector, namely solar PV. Solar energy has the highest potential compared to other renewable energy sectors of 207.9 GW. Based on that, in 2020 the Province of Bali received a Rooftop Solar PV grant through the Ministry of Energy and Mineral Resources, one of which is located at the Bali Provincial DPRD Government Office with an installed power of 25 kWp using the On Grid system. Based on this, it is necessary to conduct a detailed study of the potential, operational systems, savings and the proper management model of Rooftop Solar PV at the Bali Provincial DPRD Office. The potential of Solar PV electricity production on the roof of the Bali Provincial DPRD Office was analyzed by simulating the orientation and tilt angle of the Solar PV to get the optimum Solar PV electrical energy production results using HelioScope software. The results showed that the results of electrical energy production in the simulations of the two scenarios tended to be higher with the total difference in scenario 1 and scenario 2 being 21.75% and 19.66%, respectively. For savings that can be obtained for 6 months of Rp. 36,055,301 with a percentage of 22.60%. The PLTS management model in the future is located in the general section, precisely in the Sub Coordinator of the Equipment, Assets and Household Substance Unit.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"32 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i02.p15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Development to new renewable energy still lower than Indonesia's target of 23% in 2025. For this reason, alternative solutions are needed, namely the use of renewable energy, one of which is from the solar energy sector, namely solar PV. Solar energy has the highest potential compared to other renewable energy sectors of 207.9 GW. Based on that, in 2020 the Province of Bali received a Rooftop Solar PV grant through the Ministry of Energy and Mineral Resources, one of which is located at the Bali Provincial DPRD Government Office with an installed power of 25 kWp using the On Grid system. Based on this, it is necessary to conduct a detailed study of the potential, operational systems, savings and the proper management model of Rooftop Solar PV at the Bali Provincial DPRD Office. The potential of Solar PV electricity production on the roof of the Bali Provincial DPRD Office was analyzed by simulating the orientation and tilt angle of the Solar PV to get the optimum Solar PV electrical energy production results using HelioScope software. The results showed that the results of electrical energy production in the simulations of the two scenarios tended to be higher with the total difference in scenario 1 and scenario 2 being 21.75% and 19.66%, respectively. For savings that can be obtained for 6 months of Rp. 36,055,301 with a percentage of 22.60%. The PLTS management model in the future is located in the general section, precisely in the Sub Coordinator of the Equipment, Assets and Household Substance Unit.
分析PLTS在巴厘岛的电网容量为25kwp
新可再生能源的开发仍低于印尼2025年23%的目标。因此,需要替代解决方案,即使用可再生能源,其中之一是来自太阳能部门,即太阳能PV。与207.9吉瓦的其他可再生能源部门相比,太阳能的潜力最大。在此基础上,巴厘省于2020年通过能源和矿产资源部获得了屋顶太阳能光伏赠款,其中一个位于巴厘省DPRD政府办公室,使用电网系统安装功率为25千瓦时。基于此,有必要在巴厘岛省DPRD办公室对屋顶太阳能光伏的潜力、运营系统、节省和适当的管理模式进行详细研究。利用HelioScope软件对巴厘省DPRD办公室屋顶太阳能光伏发电的潜力进行了分析,模拟了太阳能光伏发电的朝向和倾斜角度,得到了最佳的太阳能光伏发电效果。结果表明:两种情景模拟的电能生产结果趋于较高,情景1和情景2的总差值分别为21.75%和19.66%。6个月的节余为36 055 301卢比,占22.60%。今后PLTS的管理模式将设在总科,确切地说是设在设备、资产和家庭用品股副协调员处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信