The Achievement of Resource Optimisation on Lean Remote Wellhead Platform Visit with Collaborative 52 Weeks Plan

Thin Zar Soe, Anucha Leelaratsameephanit, Phanuwat Jitputti, Sayan Charoensook, Alongkorn Rodthip, Sathit Chitkla, Apichai On-Dam, Perapon Sirijitt
{"title":"The Achievement of Resource Optimisation on Lean Remote Wellhead Platform Visit with Collaborative 52 Weeks Plan","authors":"Thin Zar Soe, Anucha Leelaratsameephanit, Phanuwat Jitputti, Sayan Charoensook, Alongkorn Rodthip, Sathit Chitkla, Apichai On-Dam, Perapon Sirijitt","doi":"10.4043/31426-ms","DOIUrl":null,"url":null,"abstract":"\n To survive in oil and gas industry, Operating Expenditure (OPEX) must be well controlled for profit maximization. One of the most resource-utilizing activities in Zawtika offshore field is remote wellhead platform (WHP) visit which was previously bi-weekly for operations activities, maintenance activities such as preventive maintenance (PM), etc., inspection activities like flowline erosion monitoring and wells annulus pressure monitoring, thereby high Marine Gas Oil (MGO) consumption due to vessel trips/routes and increased in manpower utilization. Currently, Zawtika Offshore field has a main platform called Zawtika Processing and Living Quarter Platform (ZPQ) and 10 remote wellhead platforms (WHPs). When it is considered for future, there will be more remote wellhead platforms (WHPs) which will increase more OPEX for new phases.\n To tackle this, this paper describes that Myanmar Asset Zawtika launched a LEAN (Lean Six Sigma) initiative based on safely and cost-effectively reducing the frequency of remote wellhead platforms (WHP) visits, using collaborative 52 week planning to lessen OPEX cost from MGO consumption and manpower requirements as well as maintaining Zawtika Reliability and Asset Integrity (RAI) with the view of achieving resource optimization. This paper also illustrates the effective planning process across multiple functions/disciplines within different sessions/departments and at various locations called 52 weeks plan incorporating with \"Integrated Operation Plan (IOP)\" guideline established for the first time for Zawtika offshore field to help optimize the resources and activities plan of individual field or asset by ensuring the safety while sustaining the integrity. This paper also outlines the reduction in Greenhouse Gas (GHG) calculated back from MGO reduction which is one of PTTEP strategies for Sustainable Development (SD).","PeriodicalId":11217,"journal":{"name":"Day 4 Fri, March 25, 2022","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, March 25, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31426-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

To survive in oil and gas industry, Operating Expenditure (OPEX) must be well controlled for profit maximization. One of the most resource-utilizing activities in Zawtika offshore field is remote wellhead platform (WHP) visit which was previously bi-weekly for operations activities, maintenance activities such as preventive maintenance (PM), etc., inspection activities like flowline erosion monitoring and wells annulus pressure monitoring, thereby high Marine Gas Oil (MGO) consumption due to vessel trips/routes and increased in manpower utilization. Currently, Zawtika Offshore field has a main platform called Zawtika Processing and Living Quarter Platform (ZPQ) and 10 remote wellhead platforms (WHPs). When it is considered for future, there will be more remote wellhead platforms (WHPs) which will increase more OPEX for new phases. To tackle this, this paper describes that Myanmar Asset Zawtika launched a LEAN (Lean Six Sigma) initiative based on safely and cost-effectively reducing the frequency of remote wellhead platforms (WHP) visits, using collaborative 52 week planning to lessen OPEX cost from MGO consumption and manpower requirements as well as maintaining Zawtika Reliability and Asset Integrity (RAI) with the view of achieving resource optimization. This paper also illustrates the effective planning process across multiple functions/disciplines within different sessions/departments and at various locations called 52 weeks plan incorporating with "Integrated Operation Plan (IOP)" guideline established for the first time for Zawtika offshore field to help optimize the resources and activities plan of individual field or asset by ensuring the safety while sustaining the integrity. This paper also outlines the reduction in Greenhouse Gas (GHG) calculated back from MGO reduction which is one of PTTEP strategies for Sustainable Development (SD).
协同52周计划下精益远程井口平台访井资源优化的实现
为了在油气行业生存,必须控制好运营支出(OPEX),以实现利润最大化。Zawtika海上油田资源利用率最高的活动之一是远程井口平台(WHP)访问,以前每两周一次,用于作业活动、维护活动(如预防性维护(PM)等)、检查活动(如流线侵蚀监测和井环空压力监测),因此由于船舶行程/路线和人力利用率的增加,海洋油气(MGO)消耗很高。目前,Zawtika海上油田拥有一个名为Zawtika加工和生活区平台(ZPQ)的主平台和10个远程井口平台(whp)。当考虑到未来,将会有更多的远程井口平台(whp),这将增加新阶段的运营成本。为了解决这个问题,本文描述了缅甸资产Zawtika公司推出了一项LEAN(精益六西格玛)计划,该计划基于安全和经济有效地减少远程井口平台(WHP)访问频率,使用52周协作计划来降低MGO消耗和人力需求的运营成本,并保持Zawtika的可靠性和资产完整性(RAI),以实现资源优化。本文还阐述了在不同会议/部门和不同地点跨多个功能/学科的有效规划过程,称为52周计划,结合首次为Zawtika海上油田制定的“综合作业计划(IOP)”指导方针,帮助优化单个油田或资产的资源和活动计划,确保安全,同时保持完整性。本文还概述了从MGO减少中计算出的温室气体(GHG)减少,这是PTTEP可持续发展(SD)战略之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信