Efficiency Estimation of Constructing of Wind Power Plant for the Heat Supply Needs

Q3 Energy
A. V. Bezhan
{"title":"Efficiency Estimation of Constructing of Wind Power Plant for the Heat Supply Needs","authors":"A. V. Bezhan","doi":"10.21122/1029-7448-2022-65-4-366-380","DOIUrl":null,"url":null,"abstract":"As in the whole world, there are regions in Russia that experience heat supply difficulties, mainly due to the high cost of fossil fuel as well as to growth of energy resources cost and polluting emissions. In this regard, search for solutions which would provide energy saving with an increase of energy, commercial and ecological efficiency of modern heat supply systems is becoming vitally important today. One of them is the development and use of special types of energy including renewable energy sources, wind energy in particular. Accordingly, the paper presents one of the possible solutions to the heat supply problem which are directed at meeting the whole region’s heat demand through the joint use of wind power plants with a boiler room operating on fuel oil. The study assessed the efficiency of constructing of wind power plants with a total capacity of 1.7 MW for the heat supply needs of a settlement, which is located on the Barents Sea coast in Russia. The selected area is characterized by an average annual wind speed of 7.0 m/s and a long heating period (9–10 months a year). The assessment showed that the wind power plant construction is financially reasonable, as additional profit can be generated by the end of the wind power plants scheduled service life that make up the half of primary investments. The results obtained in the paper are expected to make up for the lack of information on the feasibility of wind power plants construction for the heat supply needs, which is very useful for other countries that have similar areas experiencing various heat supply difficulties.","PeriodicalId":52141,"journal":{"name":"Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energetika. Proceedings of CIS Higher Education Institutions and Power Engineering Associations","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21122/1029-7448-2022-65-4-366-380","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Energy","Score":null,"Total":0}
引用次数: 2

Abstract

As in the whole world, there are regions in Russia that experience heat supply difficulties, mainly due to the high cost of fossil fuel as well as to growth of energy resources cost and polluting emissions. In this regard, search for solutions which would provide energy saving with an increase of energy, commercial and ecological efficiency of modern heat supply systems is becoming vitally important today. One of them is the development and use of special types of energy including renewable energy sources, wind energy in particular. Accordingly, the paper presents one of the possible solutions to the heat supply problem which are directed at meeting the whole region’s heat demand through the joint use of wind power plants with a boiler room operating on fuel oil. The study assessed the efficiency of constructing of wind power plants with a total capacity of 1.7 MW for the heat supply needs of a settlement, which is located on the Barents Sea coast in Russia. The selected area is characterized by an average annual wind speed of 7.0 m/s and a long heating period (9–10 months a year). The assessment showed that the wind power plant construction is financially reasonable, as additional profit can be generated by the end of the wind power plants scheduled service life that make up the half of primary investments. The results obtained in the paper are expected to make up for the lack of information on the feasibility of wind power plants construction for the heat supply needs, which is very useful for other countries that have similar areas experiencing various heat supply difficulties.
满足供热需求的风力发电厂建设效率评估
与全世界一样,俄罗斯也有一些地区出现供热困难,这主要是由于化石燃料的高成本,以及能源成本的增长和污染排放。在这方面,寻求在提高现代供热系统的能源、商业和生态效率的同时节约能源的解决办法在今天变得极为重要。其中之一是开发和利用特殊类型的能源,包括可再生能源,特别是风能。因此,本文提出了一种解决供热问题的可能方案,即通过风力发电厂与燃料油锅炉房联合使用来满足整个地区的供热需求。该研究评估了总容量为1.7兆瓦的风力发电厂的建设效率,以满足位于俄罗斯巴伦支海沿岸的一个定居点的供热需求。所选地区年平均风速7.0 m/s,采暖期长(9-10个月)。评估结果表明,风力发电厂的建设在财政上是合理的,因为在风力发电厂计划使用寿命结束时可以产生额外的利润,这占了初级投资的一半。本文的研究结果有望弥补风力发电厂建设的可行性方面的信息不足,对其他有类似地区面临各种供热困难的国家非常有用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
1.60
自引率
0.00%
发文量
32
审稿时长
8 weeks
期刊介绍: The most important objectives of the journal are the generalization of scientific and practical achievements in the field of power engineering, increase scientific and practical skills as researchers and industry representatives. Scientific concept publications include the publication of a modern national and international research and achievements in areas such as general energetic, electricity, thermal energy, construction, environmental issues energy, energy economy, etc. The journal publishes the results of basic research and the advanced achievements of practices aimed at improving the efficiency of the functioning of the energy sector, reduction of losses in electricity and heat networks, improving the reliability of electrical protection systems, the stability of the energetic complex, literature reviews on a wide range of energy issues.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信