Evaluation of Project Work in a Public Service Building in East Java

Andhika Dwi Kurniawan, A. Rachmansyah, Y. P. Devia
{"title":"Evaluation of Project Work in a Public Service Building in East Java","authors":"Andhika Dwi Kurniawan, A. Rachmansyah, Y. P. Devia","doi":"10.21776/ub.rekayasasipil.2023.017.03.1","DOIUrl":null,"url":null,"abstract":"In the process of implementing a project, few people find projects that go according to plan. In general, there are projects that are behind schedule, both in terms of time and schedule, but there are also projects that experience acceleration from the originally planned schedule. Project delay is a problem that arises as a result of unplanned construction implementation. Damage to the state due to additional costs and delays is one of the impacts of project delays. The purpose of this research is to track project implementation, identify factors that cause delays, calculate the cost of delays that occur, find root causes and suggest alternative solutions that can be used to anticipate project delays. Monitoring and evaluating delays require an approach that includes the use of Microsoft Project Tracking, Fishbone Charts, and Root Cause Analysis. Alternative methods are used to track performance and analyze delays in public service building projects. The results showed a lack of understanding of human resources in terms of planning/evaluating existing plans, lack of training programs related to the field of work being handled, and poor schedule planning causing a lack of lightning rods, installation in the main building, lighting in changing rooms, grounding systems, central duct/airline, less power cables than needed and original water source using PAM water converted into deep pumping wells.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"89 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.rekayasasipil.2023.017.03.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In the process of implementing a project, few people find projects that go according to plan. In general, there are projects that are behind schedule, both in terms of time and schedule, but there are also projects that experience acceleration from the originally planned schedule. Project delay is a problem that arises as a result of unplanned construction implementation. Damage to the state due to additional costs and delays is one of the impacts of project delays. The purpose of this research is to track project implementation, identify factors that cause delays, calculate the cost of delays that occur, find root causes and suggest alternative solutions that can be used to anticipate project delays. Monitoring and evaluating delays require an approach that includes the use of Microsoft Project Tracking, Fishbone Charts, and Root Cause Analysis. Alternative methods are used to track performance and analyze delays in public service building projects. The results showed a lack of understanding of human resources in terms of planning/evaluating existing plans, lack of training programs related to the field of work being handled, and poor schedule planning causing a lack of lightning rods, installation in the main building, lighting in changing rooms, grounding systems, central duct/airline, less power cables than needed and original water source using PAM water converted into deep pumping wells.
东爪哇某公共服务大楼项目工作评价
在实施项目的过程中,很少有人发现项目是按计划进行的。一般来说,有些项目在时间和进度上都落后于计划,但也有项目在最初计划的进度上经历了加速。项目延迟是由于计划外的施工实施而产生的问题。由于额外的成本和延误对国家的损害是项目延误的影响之一。本研究的目的是跟踪项目实施,确定导致延迟的因素,计算发生延迟的成本,找到根本原因并提出可用于预测项目延迟的替代解决方案。监控和评估延迟需要一种方法,包括使用微软项目跟踪、鱼骨图和根本原因分析。替代方法用于跟踪绩效和分析公共服务建设项目的延迟。结果表明,在规划/评估现有计划方面缺乏对人力资源的了解,缺乏与正在处理的工作领域相关的培训计划,以及由于缺乏避雷针,主楼安装,更衣室照明,接地系统,中央管道/航空公司,电力电缆少于所需,原始水源使用PAM水转换为深井。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书