Reduction of manufacturing lead-time through selection of machining rate and unit handling size

Pius J. Egbelu
{"title":"Reduction of manufacturing lead-time through selection of machining rate and unit handling size","authors":"Pius J. Egbelu","doi":"10.1016/0167-188X(91)90015-T","DOIUrl":null,"url":null,"abstract":"<div><p>When parts are on the shop floor and in manufacture, they are either waiting for or are being attended by a machine or a material handling equipment. When several workstations are required to process a job, the machining and moving of the parts between the workstations can be very time consuming unless it is properly planned. When poorly planned, the processing and handling decision can significantly affect the length of time the job spends in the shop. In this paper, a methodology for planning the machining and the material handling activities for the manufacture of small to medium size batches in a job shop is presented. The model determines the machining rate at each workstation and the unit-load size to use in handling the batch through the production system in order to minimize the total production time. The procedure is easy to implement on a microcomputer for use in planning shop production activities.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"21 1","pages":"Pages 21-34"},"PeriodicalIF":0.0000,"publicationDate":"1991-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(91)90015-T","citationCount":"11","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9190015T","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 11

Abstract

When parts are on the shop floor and in manufacture, they are either waiting for or are being attended by a machine or a material handling equipment. When several workstations are required to process a job, the machining and moving of the parts between the workstations can be very time consuming unless it is properly planned. When poorly planned, the processing and handling decision can significantly affect the length of time the job spends in the shop. In this paper, a methodology for planning the machining and the material handling activities for the manufacture of small to medium size batches in a job shop is presented. The model determines the machining rate at each workstation and the unit-load size to use in handling the batch through the production system in order to minimize the total production time. The procedure is easy to implement on a microcomputer for use in planning shop production activities.

通过选择加工速率和单元搬运尺寸来减少制造交货时间
当零件在车间生产时,它们要么等待机器或物料搬运设备的处理,要么由机器或物料搬运设备来处理。当需要几个工作站来处理一项工作时,除非进行适当的计划,否则在工作站之间进行零件的加工和移动可能非常耗时。如果计划不周,加工和处理决策会显著影响工作在车间中花费的时间长度。本文提出了一种在作业车间中规划中小批量加工和物料搬运活动的方法。该模型确定了每个工作站的加工速率和通过生产系统处理批次时使用的单元负载大小,以最小化总生产时间。该程序易于在微机上实现,用于规划车间生产活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信