{"title":"A Rapid Digital Estimation Model For Material in Industrial Construction","authors":"Dong Zhao, Hong Gao, Jianbin Niu","doi":"10.1109/BMSB58369.2023.10211563","DOIUrl":null,"url":null,"abstract":"In this paper, a rapid calculation model of steel quantity for industrial construction projects is established and programmed and implemented, and the calculation results can meet the accuracy requirements of investment estimation, which lays a solid foundation for the implementation of the overall system. In the case of limited design input conditions in the decision-making stage of industrial construction project projects, how to accurately predict the investment cost of civil construction projects and form a civil construction cost estimation model and estimation system are the key technologies to be studied. In this paper, the construction of a rapid estimation model for steel reinforcement volume is carried out in two ways to form a rapid estimation model for steel reinforcement volume of industrial construction projects.","PeriodicalId":13080,"journal":{"name":"IEEE international Symposium on Broadband Multimedia Systems and Broadcasting","volume":"120 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE international Symposium on Broadband Multimedia Systems and Broadcasting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BMSB58369.2023.10211563","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper, a rapid calculation model of steel quantity for industrial construction projects is established and programmed and implemented, and the calculation results can meet the accuracy requirements of investment estimation, which lays a solid foundation for the implementation of the overall system. In the case of limited design input conditions in the decision-making stage of industrial construction project projects, how to accurately predict the investment cost of civil construction projects and form a civil construction cost estimation model and estimation system are the key technologies to be studied. In this paper, the construction of a rapid estimation model for steel reinforcement volume is carried out in two ways to form a rapid estimation model for steel reinforcement volume of industrial construction projects.