{"title":"Use of RESRAD-Onsite 7.2 Code to Assess Environmental Risk around Tudor Shaft Mine Tailing Sites","authors":"R. Njinga, V. Tshivhase","doi":"10.5539/ENRR.V8N3P138","DOIUrl":null,"url":null,"abstract":"The RESRAD-onsite 7.2 code has been used to assess the total dose rate in Tudor shaft site contaminated over an area of 10 km2. The risk analysis simulation was span over a period of 1.0E+3 years. The maximum total dose of 1.64 mSv/yr was obtain at t = 8.17 ± 0.02 years. The total peak dose at time t = 0 yr. is 1.63 ± 1.0 mSv/yr for all pathways. This value is 6.53 times higher compare to the basic radiation dose limit of 2.5E-01 mSv/yr. The evaluated excess cancer risk was 3.46E-3 and is 10 times higher compared to the recommended limit of WHO. A cover layer depth of 1.25 m was simulated using the code and a total maximum peak dose for all pathways was 2.52E-01 mSv/yr at t = 5.0E+2 ± 1.0 years.","PeriodicalId":11699,"journal":{"name":"Environment and Natural Resources Research","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environment and Natural Resources Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5539/ENRR.V8N3P138","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
The RESRAD-onsite 7.2 code has been used to assess the total dose rate in Tudor shaft site contaminated over an area of 10 km2. The risk analysis simulation was span over a period of 1.0E+3 years. The maximum total dose of 1.64 mSv/yr was obtain at t = 8.17 ± 0.02 years. The total peak dose at time t = 0 yr. is 1.63 ± 1.0 mSv/yr for all pathways. This value is 6.53 times higher compare to the basic radiation dose limit of 2.5E-01 mSv/yr. The evaluated excess cancer risk was 3.46E-3 and is 10 times higher compared to the recommended limit of WHO. A cover layer depth of 1.25 m was simulated using the code and a total maximum peak dose for all pathways was 2.52E-01 mSv/yr at t = 5.0E+2 ± 1.0 years.