{"title":"Construction of a high voltage test facility","authors":"W. McDermid, J. Lambert","doi":"10.1109/TDC.2012.6281551","DOIUrl":null,"url":null,"abstract":"Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.","PeriodicalId":19873,"journal":{"name":"PES T&D 2012","volume":"321 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PES T&D 2012","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2012.6281551","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.