An application of the assignment method to shop floor scheduling

P.M. Appoo, T.D. Law ★
{"title":"An application of the assignment method to shop floor scheduling","authors":"P.M. Appoo,&nbsp;T.D. Law ★","doi":"10.1016/0377-841X(78)90009-8","DOIUrl":null,"url":null,"abstract":"<div><p>In recognition of the urgent need for local and national improvements in the use of resources and for increases in productivity, use has been made <em>on</em> the shop floor of a heavy steel forging factory of a simple aid to optimizing production scheduling.</p><p>The “Assignment Method” of solving an allocation problem, involving heating furnace capacity and various sizes of steel billets, has been implemented successfully by shop floor management who have been taught a simplified (sub-optimising) version of the basic Assignment Method.</p><p>Costs of heating operations on billets taken before and after implementation show a considerable improvement to have been obtained.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"3 4","pages":"Pages 287-294"},"PeriodicalIF":0.0000,"publicationDate":"1978-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(78)90009-8","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X78900098","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In recognition of the urgent need for local and national improvements in the use of resources and for increases in productivity, use has been made on the shop floor of a heavy steel forging factory of a simple aid to optimizing production scheduling.

The “Assignment Method” of solving an allocation problem, involving heating furnace capacity and various sizes of steel billets, has been implemented successfully by shop floor management who have been taught a simplified (sub-optimising) version of the basic Assignment Method.

Costs of heating operations on billets taken before and after implementation show a considerable improvement to have been obtained.

分配方法在车间调度中的应用
认识到地方和国家迫切需要改进资源的利用和提高生产力,在一家重型锻钢厂的车间使用了一种简单的辅助工具来优化生产计划。解决分配问题的“分配方法”涉及加热炉容量和各种尺寸的钢坯,车间管理人员已经成功地实施了简化(次优化)版本的基本分配方法。实施前后坯料加热操作的成本表明,已经取得了相当大的改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信