{"title":"Production Throughput Improvement for Plant Streamline N","authors":"Weihua Gan, P. Che, Jin-ning You","doi":"10.2991/978-94-6239-100-0_33","DOIUrl":null,"url":null,"abstract":"The objective of this research is to improve the throughput of the plant streamline N based on the methods of industrial engineering, e.g. job analysis, fishbone diagram and work study, for increased productivity. In this case study, bottlenecks diagnose and continuous productivity improvement is studied. The new production system has been designed and compared with the present throughput. The results show that new throughput of plant streamline N significantly increases from 140 to 202 per day.","PeriodicalId":16379,"journal":{"name":"Journal of Nanchang Hangkong University","volume":"158 1","pages":"177-181"},"PeriodicalIF":0.0000,"publicationDate":"2014-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Nanchang Hangkong University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/978-94-6239-100-0_33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The objective of this research is to improve the throughput of the plant streamline N based on the methods of industrial engineering, e.g. job analysis, fishbone diagram and work study, for increased productivity. In this case study, bottlenecks diagnose and continuous productivity improvement is studied. The new production system has been designed and compared with the present throughput. The results show that new throughput of plant streamline N significantly increases from 140 to 202 per day.