{"title":"REKONFIGURASI PENYULANG KINTAMANI UNTUK MENURUNKAN.RUGI-RUGI.DAYA.DAN JATUH TEGANGAN PADA WILAYAH KERJA ULP BANGLI","authors":"Putu Juliartawan, I. N. Setiawan, I. A. Arta Wijaya","doi":"10.24843/spektrum.2022.v09.i01.p15","DOIUrl":null,"url":null,"abstract":"The Kintamani supplay is uone of the feedersl in the PT PLN (Persero) UP3 East Bali Work Areawhich is the responsibility of ULP Bangli. This feeder uses a loop type configuration that servesconsumers in the Penelokan, Songan, Kintamani, Writing, Catur and Sukawana areas. This feederhas a channel length of 237,886 kms with a total distribution substation of 183 transformer units andthe peak load of this feeder reaches 3,160 kW. This condition causes a voltage drop of 7.68% andpower losses of 7.5%. The reconfiguration of this feeder is done by cutting the network which istransferred to Nandini's feeder. Reconfiguration by cutting the network shows an improvement in thevoltage of the Kintamani feeder which initially dropped from 7.68% to 3.27% and decreased powerlosses from 7.5% to 4.81%. Improvements in voltage and power losses that occur in this feederchange the value of the voltage drop and power losses on the Nandini feeder, which has an increasein the percentage of voltage drop from (-)1.44% to 1.27% and losses the initial power of 0.5% to2.10%. With this the Kintamani feeder is right for reconfiguration with the Nandini feeder. Thus, for theKintamani feeder and the Nandini feeder, it is in accordance with the 2017-2022 Distribution SystemMaster Plan Manual, where the maximum allowable voltage drop is a maximum of 19kV and amaximum power loss of 5%.","PeriodicalId":30870,"journal":{"name":"Jurnal Ilmiah Spektrum","volume":"7 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ilmiah Spektrum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24843/spektrum.2022.v09.i01.p15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Kintamani supplay is uone of the feedersl in the PT PLN (Persero) UP3 East Bali Work Areawhich is the responsibility of ULP Bangli. This feeder uses a loop type configuration that servesconsumers in the Penelokan, Songan, Kintamani, Writing, Catur and Sukawana areas. This feederhas a channel length of 237,886 kms with a total distribution substation of 183 transformer units andthe peak load of this feeder reaches 3,160 kW. This condition causes a voltage drop of 7.68% andpower losses of 7.5%. The reconfiguration of this feeder is done by cutting the network which istransferred to Nandini's feeder. Reconfiguration by cutting the network shows an improvement in thevoltage of the Kintamani feeder which initially dropped from 7.68% to 3.27% and decreased powerlosses from 7.5% to 4.81%. Improvements in voltage and power losses that occur in this feederchange the value of the voltage drop and power losses on the Nandini feeder, which has an increasein the percentage of voltage drop from (-)1.44% to 1.27% and losses the initial power of 0.5% to2.10%. With this the Kintamani feeder is right for reconfiguration with the Nandini feeder. Thus, for theKintamani feeder and the Nandini feeder, it is in accordance with the 2017-2022 Distribution SystemMaster Plan Manual, where the maximum allowable voltage drop is a maximum of 19kV and amaximum power loss of 5%.
金塔马尼供应是PT PLN (Persero) UP3东巴厘岛工作区域的供应之一,该区域由ULP Bangli负责。该馈线采用环形配置,为Penelokan, Songan, Kintamani, Writing, Catur和Sukawana地区的消费者提供服务。该馈线通道长度237886公里,总配电变电所183台,馈线峰值负荷3160千瓦。这种情况导致电压下降7.68%,功率损失7.5%。这个馈线的重新配置是通过切断转移到南迪尼馈线的网络来完成的。通过切断电网进行重新配置,Kintamani馈线的电压有所改善,最初从7.68%降至3.27%,功率损耗从7.5%降至4.81%。该馈线电压和功率损耗的改善改变了Nandini馈线的电压降和功率损耗值,使电压降百分比从(-)1.44%增加到1.27%,初始功率损失从0.5%增加到2.10%。这样,Kintamani馈线就可以与Nandini馈线重新配置了。因此,对于kintamani馈线和Nandini馈线,按照2017-2022年配电系统总体规划手册,其中最大允许电压降为最大19kV,最大功率损耗为5%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信