E. Hergon , J.F. Quaranta , N. Canivet , S. Moron , F. Pineau-Vincent , V. Vannier , J. Beauvais , M.L. Pibarot , P. Rouger
{"title":"Un programme de gestion des risques dans rétablissement de santé à travers une démarche par projet: la gestion du risque transfusionnel","authors":"E. Hergon , J.F. Quaranta , N. Canivet , S. Moron , F. Pineau-Vincent , V. Vannier , J. Beauvais , M.L. Pibarot , P. Rouger","doi":"10.1016/S0222-0776(00)88265-6","DOIUrl":null,"url":null,"abstract":"<div><p>Risk management m the hospital, which is one of the refereniets of the ANAES accreditation manual, may be considered on two levels Firstly, risk management may be approached globally, in the same way as it is tackled in the accreditation process. Secondly, risk management may be make definite. A specific risk chosen in accordance with the priorities of a particular plan may be dealt with individually. In this respect, the tranfusion process allows the risk management method to be tested and developed</p></div>","PeriodicalId":101059,"journal":{"name":"RBM-News","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S0222-0776(00)88265-6","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"RBM-News","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S0222077600882656","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Risk management m the hospital, which is one of the refereniets of the ANAES accreditation manual, may be considered on two levels Firstly, risk management may be approached globally, in the same way as it is tackled in the accreditation process. Secondly, risk management may be make definite. A specific risk chosen in accordance with the priorities of a particular plan may be dealt with individually. In this respect, the tranfusion process allows the risk management method to be tested and developed