{"title":"Improved wind turbine parts","authors":"","doi":"10.12968/s0034-3617(22)70011-2","DOIUrl":null,"url":null,"abstract":"Wind turbine manufacturer Vestas benefitted from an end-to-end additive manufacturing (AM) process which reduces downtime and improves part quality.","PeriodicalId":101069,"journal":{"name":"Reinforced Plastics","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Reinforced Plastics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12968/s0034-3617(22)70011-2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Wind turbine manufacturer Vestas benefitted from an end-to-end additive manufacturing (AM) process which reduces downtime and improves part quality.