A. Drozhdin, P. Lucas, N. Mokhov, C. Moore, S. Striganov
{"title":"Radiation environment resulting from Main Injector beam extraction to the NuMi beam line","authors":"A. Drozhdin, P. Lucas, N. Mokhov, C. Moore, S. Striganov","doi":"10.1109/PAC.1999.792880","DOIUrl":null,"url":null,"abstract":"A 120 GeV Main Injector proton beam will be delivered to the NuMI beam line at Fermilab at the rate of 3.7/spl times/10/sup 20/ per year. Realistic Monte Carlo simulations have been performed to examine the radiation environment in the beam extraction system and NuMI beam line elements. A complete 3-D model of the 160 meter extraction region has been implemented utilizing the computer code MARS. The model includes a description of the field of the electrostatic septa and POISSON calculated field maps of the Lambertson magnets and the other lattice components in the area. The beam element alignment and the source term have been simulated using the code STRUCT. Results on beam losses in the system, energy deposition in the core elements and residual dose rates on the components are presented.","PeriodicalId":20453,"journal":{"name":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1999-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1999.792880","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
A 120 GeV Main Injector proton beam will be delivered to the NuMI beam line at Fermilab at the rate of 3.7/spl times/10/sup 20/ per year. Realistic Monte Carlo simulations have been performed to examine the radiation environment in the beam extraction system and NuMI beam line elements. A complete 3-D model of the 160 meter extraction region has been implemented utilizing the computer code MARS. The model includes a description of the field of the electrostatic septa and POISSON calculated field maps of the Lambertson magnets and the other lattice components in the area. The beam element alignment and the source term have been simulated using the code STRUCT. Results on beam losses in the system, energy deposition in the core elements and residual dose rates on the components are presented.