Perencanaan Ulang Anggaran Biaya dan Waktu Pelaksanaan Gedung Perkuliahan dengan Menggunakan Metode BIM

Rizky Ilham Mardhani, Ani Ratnaningsih, S. Arifin
{"title":"Perencanaan Ulang Anggaran Biaya dan Waktu Pelaksanaan Gedung Perkuliahan dengan Menggunakan Metode BIM","authors":"Rizky Ilham Mardhani, Ani Ratnaningsih, S. Arifin","doi":"10.21776/ub.rekayasasipil.2022.016.02.3","DOIUrl":null,"url":null,"abstract":"The speed of completing all stages of the project will cause major complications in the construction management system. The BIM method can integrate all projects that can save costs and time so that it is effective and makes it easier to coordinate in order to streamline the project. The purpose of this study is the planning of a 7-story economic and business building at the University of Jember using BIM application and steps to mmodel the building using a cost and time budget. In this research, the stages in structure modeling using BIM aids, the results, the results of reinforcement modeling and the required budget plan are Rp. 9,400.450.878.04 the time required is 189 days or 6 months 9 days.","PeriodicalId":31886,"journal":{"name":"Rekayasa Sipil","volume":"21 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rekayasa Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/ub.rekayasasipil.2022.016.02.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The speed of completing all stages of the project will cause major complications in the construction management system. The BIM method can integrate all projects that can save costs and time so that it is effective and makes it easier to coordinate in order to streamline the project. The purpose of this study is the planning of a 7-story economic and business building at the University of Jember using BIM application and steps to mmodel the building using a cost and time budget. In this research, the stages in structure modeling using BIM aids, the results, the results of reinforcement modeling and the required budget plan are Rp. 9,400.450.878.04 the time required is 189 days or 6 months 9 days.
使用BIM方法重新规划演讲的成本预算和时间
完成项目所有阶段的速度将导致施工管理系统的主要复杂性。BIM方法可以整合所有可以节省成本和时间的项目,使其有效,更容易协调,以简化项目。本研究的目的是利用BIM应用程序对Jember大学的7层经济和商业建筑进行规划,并使用成本和时间预算对该建筑进行建模。在本研究中,使用BIM辅助工具进行结构建模的阶段、结果、钢筋建模结果和所需预算计划Rp. 9,400.450.878.04,所需时间为189天或6个月9天。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书