Parallel MITLs current addition at common load

E. V. Grabovskiĭ, S. L. Nedoseev, V. E. Pichugin, V. Smirnov, V.V. Zajivikhin, B.M. Oleynik
{"title":"Parallel MITLs current addition at common load","authors":"E. V. Grabovskiĭ, S. L. Nedoseev, V. E. Pichugin, V. Smirnov, V.V. Zajivikhin, B.M. Oleynik","doi":"10.1109/PPC.1995.599745","DOIUrl":null,"url":null,"abstract":"A parallel current addition at power facilities is carried out according to two main schemes as follows: (1) adding in generator water part installations \"SATURN\" and \"PBFA-II\" (SNL, USA); and (2) convolution in vacuum part \"Angara-5-1\" (TRINITI, Russia). The second scheme may be important for increasing of facilities' size, because it allows a decrease in vacuum isolator dimensions. The proposed paper deals with some experimental results on the parallel current addition at a common load. A jitter of parallel current addition is a significant effect of \"Angara-5-1\" operation. Quantitatively it is a square mean of time delay of modules T1-T8, when voltage of every module achieves 0.1 of its maximum value. These moments may be determined with +/-2 ns' accuracy.","PeriodicalId":11163,"journal":{"name":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","volume":"10 1","pages":"1011-1016 vol.2"},"PeriodicalIF":0.0000,"publicationDate":"1995-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Technical Papers. Tenth IEEE International Pulsed Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.1995.599745","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A parallel current addition at power facilities is carried out according to two main schemes as follows: (1) adding in generator water part installations "SATURN" and "PBFA-II" (SNL, USA); and (2) convolution in vacuum part "Angara-5-1" (TRINITI, Russia). The second scheme may be important for increasing of facilities' size, because it allows a decrease in vacuum isolator dimensions. The proposed paper deals with some experimental results on the parallel current addition at a common load. A jitter of parallel current addition is a significant effect of "Angara-5-1" operation. Quantitatively it is a square mean of time delay of modules T1-T8, when voltage of every module achieves 0.1 of its maximum value. These moments may be determined with +/-2 ns' accuracy.
在共同负载下并联mitl电流的增加
电力设施并联加电流主要有以下两种方案:(1)在发电机组水部分安装“SATURN”和“PBFA-II”(SNL, USA);(2)真空部分“Angara-5-1”(TRINITI,俄罗斯)的卷积。第二种方案对于增加设备尺寸可能很重要,因为它允许真空隔离器尺寸的减小。本文讨论了在普通负载下并联加电流的一些实验结果。并联电流叠加的抖动是“安加拉-5-1”操作的重要影响。定量为各模块电压达到其最大值0.1时模块T1-T8延时的平方平均值。这些力矩可以用+/-2 ns的精度来确定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信