What Happens With Good Requirements Practices

I. Hooks
{"title":"What Happens With Good Requirements Practices","authors":"I. Hooks","doi":"10.1109/ISRE.2001.948572","DOIUrl":null,"url":null,"abstract":"Summary form only given, as follows. We?ve heard of the problems with bad requirements. We all have horror stories about the things that go wrong, the cost overruns, the schedule slips, the lost opportunities. What happens when you do it right. Some companies and government organizations are making requirement process changes and seeing some wonderful results. We will look at what has been done and what has resulted from several real programs. We?ll talk about the things that have worked best, things that did not get the expected results and things that have yet to be tried.","PeriodicalId":90955,"journal":{"name":"Proceedings. IEEE International Requirements Engineering Conference","volume":"35 1","pages":"268"},"PeriodicalIF":0.0000,"publicationDate":"2001-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. IEEE International Requirements Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISRE.2001.948572","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary form only given, as follows. We?ve heard of the problems with bad requirements. We all have horror stories about the things that go wrong, the cost overruns, the schedule slips, the lost opportunities. What happens when you do it right. Some companies and government organizations are making requirement process changes and seeing some wonderful results. We will look at what has been done and what has resulted from several real programs. We?ll talk about the things that have worked best, things that did not get the expected results and things that have yet to be tried.
好的需求实践会发生什么
仅给出摘要形式,如下。我们吗?我听说过需求不好的问题。我们都有关于出错的可怕故事,成本超支,进度延误,失去机会。当你做对了会发生什么。一些公司和政府机构正在对需求过程进行更改,并看到了一些奇妙的结果。我们将看看已经做了什么,以及几个真正的项目产生了什么结果。我们吗?我将讨论最有效的方法,没有达到预期效果的方法和尚未尝试的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信