Bridge Plug Drillouts Cleaning Practices—An Overview

H. Trabelsi, A. Seibi, Ning Liu, F. Boukadi, R. Trabelsi
{"title":"Bridge Plug Drillouts Cleaning Practices—An Overview","authors":"H. Trabelsi, A. Seibi, Ning Liu, F. Boukadi, R. Trabelsi","doi":"10.4236/NR.2021.122003","DOIUrl":null,"url":null,"abstract":"Horizontal fracture-simulated completions remain the most reliable method of producing hydrocarbons from shale formations. The vast majority of unconventional wells are completed using the “Plug and Perf” method. This method involves using either a coiled tubing (CT) with a positive displacement motor or a jointed pipe to mill out composite plugs after fracturing operations are completed. An estimated average of 120,000 composite plugs is installed in the US alone each year. Bridge plug drillouts from milling operations tend to accumulate in horizontal wells and can cause stuck pipe incidents and loss of well control. Efficient removal of composite plugs’ debris is crucial in achieving operational efficacies and full production potential. This paper provides an overview of the various bridge plug drillouts cleaning practices adopted in horizontal wells. It discusses several case histories, showcasing how operators solved cleanout challenges. Developed mechanistic models to better understand hole cleaning are also reviewed. As more unconventional wells are being set at more extensive depths, an economical and optimized coiled tubing process becomes increasingly important. This paper focuses on delivering a more conclusive set of recommendations to increase efficiency and improve current composite plug coiled tubing cleaning-milling practices, increase operational efficiency and reduce cost.","PeriodicalId":19086,"journal":{"name":"Natural Resources","volume":"117 1","pages":"19-33"},"PeriodicalIF":0.0000,"publicationDate":"2021-02-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Natural Resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/NR.2021.122003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Horizontal fracture-simulated completions remain the most reliable method of producing hydrocarbons from shale formations. The vast majority of unconventional wells are completed using the “Plug and Perf” method. This method involves using either a coiled tubing (CT) with a positive displacement motor or a jointed pipe to mill out composite plugs after fracturing operations are completed. An estimated average of 120,000 composite plugs is installed in the US alone each year. Bridge plug drillouts from milling operations tend to accumulate in horizontal wells and can cause stuck pipe incidents and loss of well control. Efficient removal of composite plugs’ debris is crucial in achieving operational efficacies and full production potential. This paper provides an overview of the various bridge plug drillouts cleaning practices adopted in horizontal wells. It discusses several case histories, showcasing how operators solved cleanout challenges. Developed mechanistic models to better understand hole cleaning are also reviewed. As more unconventional wells are being set at more extensive depths, an economical and optimized coiled tubing process becomes increasingly important. This paper focuses on delivering a more conclusive set of recommendations to increase efficiency and improve current composite plug coiled tubing cleaning-milling practices, increase operational efficiency and reduce cost.
桥塞钻出清洗方法概述
水平压裂模拟完井仍然是最可靠的页岩油气开采方法。绝大多数非常规井都是使用“桥塞射孔”方法完成的。该方法包括在压裂作业完成后,使用带正排量马达的连续油管(CT)或连接管磨铣复合桥塞。据估计,仅在美国,每年平均安装12万个复合桥塞。铣磨作业中钻出的桥塞往往会积聚在水平井中,并可能导致卡钻事故和井控失控。有效清除复合桥塞碎屑对于实现作业效率和充分发挥生产潜力至关重要。本文概述了水平井中各种桥塞钻出清洗方法。它讨论了几个历史案例,展示了作业者如何解决清洗挑战。为更好地理解井眼清洗,本文还回顾了已开发的机理模型。随着非常规井的深度越来越大,经济且优化的连续油管工艺变得越来越重要。本文的重点是提供一套更具结论性的建议,以提高效率,改善当前复合桥塞连续油管的洗铣作业,提高作业效率,降低成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信