Measuring project progress by work sampling

M. Hailey
{"title":"Measuring project progress by work sampling","authors":"M. Hailey","doi":"10.1109/PICMET.1991.183631","DOIUrl":null,"url":null,"abstract":"The authors relate how independent systems for measuring project progress and resource performance were used in aiding both the client and contractors in planning work force size and scheduling to reduce cost and improve both efficiency and effectiveness. Goaded by comments from the prime contractor, the consultants set about the determine if they could combine the independent systems. To the surprise of everyone, the consultants were able to independently forecast job progress using only the results from the performance measurement system. A math model was developed and statistical analysis was used to validate the results.<<ETX>>","PeriodicalId":22349,"journal":{"name":"Technology Management : the New International Language","volume":"11 1","pages":"272-274"},"PeriodicalIF":0.0000,"publicationDate":"1991-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Technology Management : the New International Language","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.1991.183631","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The authors relate how independent systems for measuring project progress and resource performance were used in aiding both the client and contractors in planning work force size and scheduling to reduce cost and improve both efficiency and effectiveness. Goaded by comments from the prime contractor, the consultants set about the determine if they could combine the independent systems. To the surprise of everyone, the consultants were able to independently forecast job progress using only the results from the performance measurement system. A math model was developed and statistical analysis was used to validate the results.<>
通过工作抽样来衡量项目进度
作者介绍了如何使用独立的系统来衡量项目进度和资源绩效,以帮助客户和承包商规划劳动力规模和时间表,以降低成本,提高效率和效益。在主承包商评论的激励下,顾问们开始决定他们是否可以将独立的系统结合起来。令所有人惊讶的是,顾问们能够仅使用绩效评估系统的结果独立预测工作进度。建立了数学模型,并用统计分析对结果进行了验证
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信