{"title":"DEVELOPING GUIDELINES FOR ENVIRONMENTAL IMPACT ASSESSMENT OF KASHMIR UNDERPASS PROJECT IN FAISALABAD","authors":"Muhammad Aurangzaib, Shahbaz Khan, Muneeb Ahmad, M. Touseef, A. Nasir","doi":"10.26480/gwk.02.2020.39.43","DOIUrl":null,"url":null,"abstract":"Road development projects are important as they provide economical, political and social benefits but delays can occur. EIA is conducted for every project as required by the Environmental Protection Act of 1997 and the Environmental Policy of Pakistan for the purpose of ensuring mitigation of environmental impacts due to project activities. The Kashmir Underpass project in Faisalabad is assigned to FDA, for the purpose of satisfying growing need of traffic load due to population increase in surrounding areas in newly developed societies. This research examines the different factors of project affecting the environment. Questionnaire approach was utilized to gain insights of environmental impacts due to the project. Results showed that 93% of respondents didn’t knew about EIA and why it is necessary. Respondents were facing impacts from dust particles, noise, traffic, business loss etc. These impacts were analyzed and guidelines were developed for EIA of Kashmir Underpass Project.","PeriodicalId":32518,"journal":{"name":"Engineering Heritage Journal","volume":"33 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Heritage Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26480/gwk.02.2020.39.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Road development projects are important as they provide economical, political and social benefits but delays can occur. EIA is conducted for every project as required by the Environmental Protection Act of 1997 and the Environmental Policy of Pakistan for the purpose of ensuring mitigation of environmental impacts due to project activities. The Kashmir Underpass project in Faisalabad is assigned to FDA, for the purpose of satisfying growing need of traffic load due to population increase in surrounding areas in newly developed societies. This research examines the different factors of project affecting the environment. Questionnaire approach was utilized to gain insights of environmental impacts due to the project. Results showed that 93% of respondents didn’t knew about EIA and why it is necessary. Respondents were facing impacts from dust particles, noise, traffic, business loss etc. These impacts were analyzed and guidelines were developed for EIA of Kashmir Underpass Project.
制定费萨拉巴德克什米尔地下通道项目环境影响评估准则
道路发展项目很重要,因为它们能带来经济、政治和社会效益,但也可能出现延误。根据1997年《环境保护法》和巴基斯坦环境政策的要求,对每个项目进行环境影响评估,以确保减轻项目活动对环境的影响。费萨拉巴德的克什米尔地下通道项目被分配给食品和药物管理局,目的是满足新发达社会周边地区人口增长对交通负荷日益增长的需求。本研究考察了项目影响环境的不同因素。采用问卷调查的方法来了解项目对环境的影响。调查结果显示,93%的受访者不了解环评以及环评的必要性。受访者面临着粉尘颗粒、噪音、交通、业务损失等方面的影响。对这些影响进行了分析,并为克什米尔地下通道项目制定了环评准则。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信