{"title":"Completion techniques for horizontal wells in the Pearsall Austin Chalk","authors":"C. D. Pope, P. Handren","doi":"10.2118/20682-PA","DOIUrl":null,"url":null,"abstract":"Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"20 3-4 1","pages":"144-148"},"PeriodicalIF":0.0000,"publicationDate":"1992-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/20682-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
Oryx Energy Co. used three basic completion techniques and various combinations of them to complete 20 horizontal wells in the Pearsall Austin Chalk. The completion method selected is based on a general set of guidelines. Additionally, equipment selection and various types of workover operations are reviewed