Lewis O. Makana, N. Metje, I. Jefferson, M. Sackey, Chris D F Rogers
{"title":"Cost estimation of utility strikes: towards proactive management of street works","authors":"Lewis O. Makana, N. Metje, I. Jefferson, M. Sackey, Chris D F Rogers","doi":"10.1680/JINAM.17.00033","DOIUrl":null,"url":null,"abstract":"The true (full) cost of a utility strike incident is rarely known. Generally, only the direct costs are used to measure the impact of utility strikes; the wider indirect and social costs are rarely...","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":null,"pages":null},"PeriodicalIF":1.9000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JINAM.17.00033","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 14
Abstract
The true (full) cost of a utility strike incident is rarely known. Generally, only the direct costs are used to measure the impact of utility strikes; the wider indirect and social costs are rarely...