ANALISIS PENJADWALAN DAN ALOKASI SUMBER DAYA PADA PROYEK KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Pekerjaan Struktur Proyek XYZ)

Danang Isnubroto, Citra Kharisma Putri
{"title":"ANALISIS PENJADWALAN DAN ALOKASI SUMBER DAYA PADA PROYEK KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Pekerjaan Struktur Proyek XYZ)","authors":"Danang Isnubroto, Citra Kharisma Putri","doi":"10.32497/WAHANATS.V26I1.2647","DOIUrl":null,"url":null,"abstract":"One of the computer applications that can be used in project management control is the Microsoft Project application. With Microsoft Project , information related to activities that fall into the critical trajectory and allocation of resource placement can be known, so that the project does not experience delays and a decrease in work productivity. Based on the results of the analysis using the Microsoft project, it is found that activities are included in the critical trajectory, namely: pile work, soldier pile, excavation, excavation fireplace, brickwork installation, work floor, pile cap and superstructure work. The results of the analysis show the need for the number of workers from the 1st month to the 8th month: 31, 43, 43, 40, 37, 31, 10. The needs of the foreman are: 2, 3, 3, 2, 2, 2 , 2, 1. For crane operator resources in the 1st month and 2nd month is as many as 3 people. Subcontractor 1 and subcontractor 2 require as many as 1 person in the resources of the 2nd month to the 3rd month. A mason is needed from the 2nd to the 8th month: 12, 9, 8, 7, 7, 6, 2. Resource analysis for the head mason every month: 3, 3, 2, 2, 2, 2, 1. Analysis of the allocation of resource placement can be carried out in several stages if a graph of the resources fluctuates or does not comply with the principle of resource allocation.","PeriodicalId":34836,"journal":{"name":"Prokons","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Prokons","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32497/WAHANATS.V26I1.2647","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

One of the computer applications that can be used in project management control is the Microsoft Project application. With Microsoft Project , information related to activities that fall into the critical trajectory and allocation of resource placement can be known, so that the project does not experience delays and a decrease in work productivity. Based on the results of the analysis using the Microsoft project, it is found that activities are included in the critical trajectory, namely: pile work, soldier pile, excavation, excavation fireplace, brickwork installation, work floor, pile cap and superstructure work. The results of the analysis show the need for the number of workers from the 1st month to the 8th month: 31, 43, 43, 40, 37, 31, 10. The needs of the foreman are: 2, 3, 3, 2, 2, 2 , 2, 1. For crane operator resources in the 1st month and 2nd month is as many as 3 people. Subcontractor 1 and subcontractor 2 require as many as 1 person in the resources of the 2nd month to the 3rd month. A mason is needed from the 2nd to the 8th month: 12, 9, 8, 7, 7, 6, 2. Resource analysis for the head mason every month: 3, 3, 2, 2, 2, 2, 1. Analysis of the allocation of resource placement can be carried out in several stages if a graph of the resources fluctuates or does not comply with the principle of resource allocation.
利用微软项目(XYZ项目结构案例研究)对建设项目的调度和分配资源分析
可以用于项目管理控制的计算机应用程序之一是Microsoft project应用程序。使用Microsoft Project,可以知道与落入关键轨迹的活动相关的信息,以及资源放置的分配,这样项目就不会经历延迟和工作效率的降低。根据微软项目的分析结果,发现在关键轨迹中包括活动,即:桩工作,士兵桩,开挖,开挖壁炉,砌砖安装,工作地板,桩帽和上层建筑工作。分析结果显示,第1个月至第8个月所需工人人数为:31、43、43、40、37、31、10。工头的需求是:2、3、3、2、2、2、1。第1个月和第2个月的起重机操作员资源多达3人。分包商1和分包商2在第2个月至第3个月的资源中需要多达1人。从第2个月到第8个月需要一个泥瓦匠:12,9,8,7,7,6,2。每月泥瓦匠资源分析:3,3,2,2,2,2,1。如果资源图出现波动或不符合资源配置原则,可以分几个阶段进行资源配置分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
6
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信