Analisis Drop Tegangan Listrik Menggunakan ETAP Pada Penyulang Utari PT. PLN (Persero) Unit Layanan Pelanggan Bandarjaya

Hamimi Hamimi, Muhammad Irfan Chaniago, Hendrarto Widodo
{"title":"Analisis Drop Tegangan Listrik Menggunakan ETAP Pada Penyulang Utari PT. PLN (Persero) Unit Layanan Pelanggan Bandarjaya","authors":"Hamimi Hamimi, Muhammad Irfan Chaniago, Hendrarto Widodo","doi":"10.36269/jtr.v4i1.985","DOIUrl":null,"url":null,"abstract":"Voltage drop is the loss of voltage caused by several factors. PLN sets the standard of voltage at +5% -10% of the line voltage. The Utari feeder experiences a voltage drop caused by the length of the network plus the amount of load that is concentrated at the end of a network. This study uses observation method or library research. The source of the data used is secondary data (which already exists) which is then simulated using the ETAP application by utilizing the Load Flow Analysis function so that the results of the power flow in the electrical system are obtained. Based on the results of the study, to increase the voltage by building an underbuild network. The construction of this underbuild network aims to cut the length of the Utari feeder which is then maneuvered into Gunung Madu Plantation feeder. The voltage which was originally 17.217kV to 18.968kV with a difference is 1.751kV, namely there is an increase in voltage of about 7.4% from before. With the breaking of the load, it can shorten length of the feeder, so that by reducing the length of the feeder, the inductive reactance of the line will decrease so that the shrinkage is smaller.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36269/jtr.v4i1.985","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Voltage drop is the loss of voltage caused by several factors. PLN sets the standard of voltage at +5% -10% of the line voltage. The Utari feeder experiences a voltage drop caused by the length of the network plus the amount of load that is concentrated at the end of a network. This study uses observation method or library research. The source of the data used is secondary data (which already exists) which is then simulated using the ETAP application by utilizing the Load Flow Analysis function so that the results of the power flow in the electrical system are obtained. Based on the results of the study, to increase the voltage by building an underbuild network. The construction of this underbuild network aims to cut the length of the Utari feeder which is then maneuvered into Gunung Madu Plantation feeder. The voltage which was originally 17.217kV to 18.968kV with a difference is 1.751kV, namely there is an increase in voltage of about 7.4% from before. With the breaking of the load, it can shorten length of the feeder, so that by reducing the length of the feeder, the inductive reactance of the line will decrease so that the shrinkage is smaller.
电压降是由几种因素引起的电压损失。PLN将电压标准设定为线路电压的+5% ~ 10%。乌塔里馈线的电压下降是由网络的长度加上集中在网络末端的负载量引起的。本研究采用观察法或图书馆研究法。所使用的数据来源是二次数据(已经存在),然后使用ETAP应用程序利用负载流分析功能对其进行模拟,从而获得电力系统中潮流的结果。在研究结果的基础上,通过建立欠建网络来提高电压。这个基础网络的建设旨在缩短乌塔里馈线的长度,然后将其移动到Gunung Madu种植园馈线。电压由原来的17.217kV到18.968kV相差了1.751kV,即电压比原来增加了约7.4%。随着负载的断开,它可以缩短给料机的长度,这样通过减少给料机的长度,使线路的感应抗减小,使收缩更小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信