Management attitudes in laboratory automation projects and quality programmes

J.M. Andrade , R.D. McDowall
{"title":"Management attitudes in laboratory automation projects and quality programmes","authors":"J.M. Andrade ,&nbsp;R.D. McDowall","doi":"10.1016/S1381-141X(98)80007-5","DOIUrl":null,"url":null,"abstract":"<div><p>For laboratory automation and quality schemes to succeed, there must be management commitment to the project. To get significant improvements in laboratory performance, critical changes are needed which require open-minded and team approaches. Unless this happens, the project will fail. This paper explores the reasons why older style managers fail to support these projects. Radical changes in management are proposed; from direction to teamwork and commitment; from power to delegated authority and empowerment. This already happens in the leading companies, but many organisations have older management styles which should change.</p></div>","PeriodicalId":100862,"journal":{"name":"Laboratory Automation & Information Management","volume":"33 3","pages":"Pages 217-226"},"PeriodicalIF":0.0000,"publicationDate":"1998-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1381-141X(98)80007-5","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Laboratory Automation & Information Management","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1381141X98800075","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

For laboratory automation and quality schemes to succeed, there must be management commitment to the project. To get significant improvements in laboratory performance, critical changes are needed which require open-minded and team approaches. Unless this happens, the project will fail. This paper explores the reasons why older style managers fail to support these projects. Radical changes in management are proposed; from direction to teamwork and commitment; from power to delegated authority and empowerment. This already happens in the leading companies, but many organisations have older management styles which should change.

实验室自动化项目和质量计划的管理态度
为了使实验室自动化和质量计划取得成功,必须对项目做出管理承诺。为了显著提高实验室性能,需要进行关键的变革,这需要开放的团队方法。除非发生这种情况,否则该项目将失败。本文探讨了老一辈管理者未能支持这些项目的原因。提议对管理进行根本性改革;从指导到团队合作和承诺;从权力到授权和授权。这种情况在领先的公司中已经发生了,但许多组织的管理风格已经过时,应该改变。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信