Yuanshyi Peter Chiu, Tingting Yan, Yunsen Wang, Hui-Chi Wang
{"title":"Replenishment-shipment decision for a multiproduct producer-client coordinated FPR model with postponement, rework and subcontracting","authors":"Yuanshyi Peter Chiu, Tingting Yan, Yunsen Wang, Hui-Chi Wang","doi":"10.5267/j.uscm.2022.10.005","DOIUrl":null,"url":null,"abstract":"This research constructs a mathematical scheme to explore replenishment-shipment decisions for a multiproduct producer-client coordinated finite production rate (FPR) model with the postponement, rework, and subcontracting plan. The considered multiple goods have a common component, and a batch FPR fabrication with postponement is planned to meet the annual multiproduct requirements. The first fabricating phase makes only the standard components needed for a batch and subcontracts a proportion of them (with additional cost) to expedite the process. In contrast, the second fabricating phase produces the finished multiple merchandise in sequence. The in-house rework processes with extra expense help retain the desirable quality. Each merchandise’s finished batch is transported to the clients in equal-sized numerous shipments. This study derives the optimal batch cycle length and transporting frequency by minimizing the overall fabricating-shipment expenses (including clients’ holding costs). This work offers a numerical example demonstrating various crucial system features influenced by the factors of subcontracting, postponement, rework, and transportation policies to facilitate managerial decision making in industries.","PeriodicalId":23429,"journal":{"name":"Uncertain Supply Chain Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Uncertain Supply Chain Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.uscm.2022.10.005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 5
Abstract
This research constructs a mathematical scheme to explore replenishment-shipment decisions for a multiproduct producer-client coordinated finite production rate (FPR) model with the postponement, rework, and subcontracting plan. The considered multiple goods have a common component, and a batch FPR fabrication with postponement is planned to meet the annual multiproduct requirements. The first fabricating phase makes only the standard components needed for a batch and subcontracts a proportion of them (with additional cost) to expedite the process. In contrast, the second fabricating phase produces the finished multiple merchandise in sequence. The in-house rework processes with extra expense help retain the desirable quality. Each merchandise’s finished batch is transported to the clients in equal-sized numerous shipments. This study derives the optimal batch cycle length and transporting frequency by minimizing the overall fabricating-shipment expenses (including clients’ holding costs). This work offers a numerical example demonstrating various crucial system features influenced by the factors of subcontracting, postponement, rework, and transportation policies to facilitate managerial decision making in industries.
期刊介绍:
Supply chain management (SCM) plays an essential role in managing the movement of raw materials into an organization, certain issues of the internal processing of materials into finished goods, and the movement of finished products out of the organization for end-consumer delivery. The goal of SCM is to improve trust and collaboration among supply chain partners and to improve inventory visibility. However, many SCM problems deal with uncertain events such as uncertainty in demand, supply, quality, price, etc. This forum is dedicated to all scholars who wish to share their ideas about uncertainty in SCM problems. Uncertain supply chain management is a quarterly publication dedicated to all scientists in all over the world who wish to share their experiences and knowledge in this field. Our policy is to perform a peer review on all submitted articles and publishes original and high quality articles.