What are the established expectations for the artifacts addressed in project portfolio management?

IF 0.6 Q4 BUSINESS
Silvio Cesar Alves Teixeira, Cristiane Drebes Pedron
{"title":"What are the established expectations for the artifacts addressed in project portfolio management?","authors":"Silvio Cesar Alves Teixeira, Cristiane Drebes Pedron","doi":"10.5585/gep.v14i2.23869","DOIUrl":null,"url":null,"abstract":"The objective of this research was to evaluate elements present in 75 academic articles and 308 patents to propose a research agenda considering the following question: What is expected from new artifacts aimed at Project Portfolio Management? As a method, we decided to carry out an Systematic Review of Literature and Patents and as results we identified artifacts such as models, methods and software distributed in two dimensions: (1) Plurality, built for specific situations and problems, present in the literature and not tested in the field, which demonstrate the path taken so far; (2) Prospecting, care that directs mapped needs to the development of new studies with greater practical application. As a guiding proposal, we propose the following factors Dynamic Portfolio, Simplification, Integrative Approach, and Integrated Tools to support future studies when there is a need to develop new studies focused on Project Portfolio Management.","PeriodicalId":42575,"journal":{"name":"Revista de Gestao e Projetos","volume":null,"pages":null},"PeriodicalIF":0.6000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de Gestao e Projetos","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5585/gep.v14i2.23869","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 0

Abstract

The objective of this research was to evaluate elements present in 75 academic articles and 308 patents to propose a research agenda considering the following question: What is expected from new artifacts aimed at Project Portfolio Management? As a method, we decided to carry out an Systematic Review of Literature and Patents and as results we identified artifacts such as models, methods and software distributed in two dimensions: (1) Plurality, built for specific situations and problems, present in the literature and not tested in the field, which demonstrate the path taken so far; (2) Prospecting, care that directs mapped needs to the development of new studies with greater practical application. As a guiding proposal, we propose the following factors Dynamic Portfolio, Simplification, Integrative Approach, and Integrated Tools to support future studies when there is a need to develop new studies focused on Project Portfolio Management.
在项目组合管理中所处理的工件的既定期望是什么?
本研究的目的是评估75篇学术文章和308项专利中出现的元素,并提出一个考虑以下问题的研究议程:针对项目组合管理的新工件的期望是什么?作为一种方法,我们决定对文献和专利进行系统回顾,作为结果,我们确定了分布在两个维度上的工件,如模型、方法和软件:(1)为特定情况和问题构建的多样性,存在于文献中,但未在该领域进行测试,这表明了迄今为止所采取的路径;(2)探矿,引导测绘需求发展具有更大实际应用价值的新研究。作为指导性建议,我们提出了以下因素动态组合、简化、综合方法和综合工具,以支持未来的研究,当需要开发新的研究集中在项目组合管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
18
审稿时长
4 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信