M. S. Nagano, Caio Paziani Tomazella, Roberto Fernandes Tavares-Neto, L. R. Abreu
{"title":"Solution methods for the integrated permutation flowshop and vehicle routing problem","authors":"M. S. Nagano, Caio Paziani Tomazella, Roberto Fernandes Tavares-Neto, L. R. Abreu","doi":"10.5267/j.jpm.2022.1.002","DOIUrl":null,"url":null,"abstract":"The integration between production and distribution to minimize total elapsed time is an important issue for industries that produce products with a short lifespan. However, the literature focus on production environments with a single stage. This paper enhances the complexity of the production system of an integrated production and distribution system by considering flowshop environment decisions integrated with a vehicle routing problem decision. In this case, each order is produced in a permutation flowshop subsystem and then shipped to its destination by a capacitated vehicle, and the objective is to sequence these orders to minimize the makespan of the schedule. This paper uses two approaches to address this integrated problem: a mixed-integer formulation and an Iterated Greedy algorithm. The experimentation shows that the Iterated Greedy algorithm yields results with a 0.02% deviation from the optimal for problems with five jobs, and is a viable option to be used in practical cases due to its short computational time.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.1.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 2
Abstract
The integration between production and distribution to minimize total elapsed time is an important issue for industries that produce products with a short lifespan. However, the literature focus on production environments with a single stage. This paper enhances the complexity of the production system of an integrated production and distribution system by considering flowshop environment decisions integrated with a vehicle routing problem decision. In this case, each order is produced in a permutation flowshop subsystem and then shipped to its destination by a capacitated vehicle, and the objective is to sequence these orders to minimize the makespan of the schedule. This paper uses two approaches to address this integrated problem: a mixed-integer formulation and an Iterated Greedy algorithm. The experimentation shows that the Iterated Greedy algorithm yields results with a 0.02% deviation from the optimal for problems with five jobs, and is a viable option to be used in practical cases due to its short computational time.