Impacts of change management on risk and cost management of a construction projects

IF 1.3 Q4 ENGINEERING, INDUSTRIAL
Mohamed Ibrahim Khalifa Halou, R. Samin, Mushtaq Aḥmad
{"title":"Impacts of change management on risk and cost management of a construction projects","authors":"Mohamed Ibrahim Khalifa Halou, R. Samin, Mushtaq Aḥmad","doi":"10.5267/J.JPM.2019.1.005","DOIUrl":null,"url":null,"abstract":"Article history: Received: October 2 2018 Received in revised format: November 19 2018 Accepted: January 12 2019 Available online: January 14 2019 Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk management was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":"1 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.005","citationCount":"20","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.1.005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 20

Abstract

Article history: Received: October 2 2018 Received in revised format: November 19 2018 Accepted: January 12 2019 Available online: January 14 2019 Construction projects are always problematic and difficult to manage in certain stages. Management in construction industry has been characterized as being weak, insufficient, nebulous, backward and slow to react against changing conditions. This study aims to identify risk and cost managed in the change management of the construction projects. Quantitative study is organized and questionnaire as an instrument is used to collect the information from the construction experts in Klang Valley, Malaysia. Random sampling techniques is used to collect the data, 105 questionnaires are distributed and 90 ones are returned. The correlation analysis shows significant relationship between cost, risk and change management. The reliability test indicates satisfactory result to continue the questionnaire where Cronbach coefficient alpha value exceeds the level of 0.70. The study finds that design changes, client and contractor related changes are mostly occurred in change management of construction projects. Tendering on the basis of an incomplete design, which then changes during the course of the construction has been found as the key reason of the changes. Through a paper based exercise, site memorandums (SM), quoted rates (QR), variation orders (VO) and monthly payment certificates (MPC) are the activities managed by the engineers. Proper planning is the most leading change management in the risk management. Implementation of risk management was found the applied risk management in practice to hindrances. Since this is very vast debated subject, the study has recommended further investigation to include consultant firms for better understanding of the design changes leading to the cost and risk associated.
变更管理对建设项目风险和成本管理的影响
文章历史:收稿日期:2018年10月2日收稿日期:2018年11月19日接收日期:2019年1月12日在线提供日期:2019年1月14日建设项目总是有问题,在某些阶段难以管理。建筑业管理存在薄弱、不足、模糊、落后、反应迟钝等特点。本研究旨在探讨建设项目变更管理中的风险与成本管理。定量研究是组织和问卷调查作为一种工具,以收集信息的建筑专家在巴生谷,马来西亚。采用随机抽样方法收集数据,共发放问卷105份,回收问卷90份。相关分析表明,成本、风险和变革管理之间存在显著的关系。信度检验表明,Cronbach系数α值超过0.70的水平,可以继续进行问卷调查。研究发现,设计变更、与业主和承包商相关的变更多发生在建筑项目变更管理中。在不完整的设计基础上进行招标,然后在施工过程中进行变更,这是导致变更的主要原因。通过纸质作业,现场备忘录(SM)、报价(QR)、变更单(VO)和每月付款证书(MPC)是工程师管理的活动。适当的计划是风险管理中最重要的变更管理。风险管理的实施发现了在实践中应用风险管理的障碍。由于这是一个非常有争议的话题,该研究建议进一步调查,包括咨询公司,以更好地了解设计变更导致的成本和相关风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信