Improving Construction Process through Integration and Concurrent Engineering

IF 0.1
N. Raja
{"title":"Improving Construction Process through Integration and Concurrent Engineering","authors":"N. Raja","doi":"10.5130/AJCEB.V5I1.2945","DOIUrl":null,"url":null,"abstract":"In an increasingly competitive business environment, improvedtime-to-market, reduced production cost, quality of the productand customer involvement are rapidly becoming the key successfactors for any product development process. Consequently, mostorganisations are moving towards the adoption of latest technologyand new management concepts and philosophies such as totalquality management and concurrent engineering (CE) to bringimprovement in their product development process. This paperdiscusses the adoption of integrated processes and CE withinthe construction industry to enable construction organisations toimprove their project development process. It also discusses aproposed integrated database model for the construction projects,which should enable the construction process to improve, becomemore effective and more efficient.","PeriodicalId":42149,"journal":{"name":"African Journal of Neurological Sciences","volume":"1 1","pages":"58-66"},"PeriodicalIF":0.1000,"publicationDate":"2012-11-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5130/AJCEB.V5I1.2945","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"African Journal of Neurological Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/AJCEB.V5I1.2945","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

In an increasingly competitive business environment, improvedtime-to-market, reduced production cost, quality of the productand customer involvement are rapidly becoming the key successfactors for any product development process. Consequently, mostorganisations are moving towards the adoption of latest technologyand new management concepts and philosophies such as totalquality management and concurrent engineering (CE) to bringimprovement in their product development process. This paperdiscusses the adoption of integrated processes and CE withinthe construction industry to enable construction organisations toimprove their project development process. It also discusses aproposed integrated database model for the construction projects,which should enable the construction process to improve, becomemore effective and more efficient.
通过集成和并行工程改进施工过程
在竞争日益激烈的商业环境中,缩短上市时间、降低生产成本、提高产品质量和提高客户参与度正迅速成为任何产品开发过程的关键成功因素。因此,大多数组织正朝着采用最新技术和新的管理理念和哲学的方向发展,如全面质量管理和并行工程(CE),以改善其产品开发过程。本文讨论了在建造业中采用综合流程和行政效益,以使建造业组织能够改进其项目开发过程。本文还讨论了一种针对工程建设项目的综合数据库模型,该模型将使工程建设过程得到改进,变得更加有效和高效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信