Evolution of Sedimentation in a Headrace Canal for Hydroelectric Production Case of the Shongo Basin of the Inga Complex from February 2020 to May 2021 (Kongo Central Province/DR Congo)

O. K. Kalonda, Ivon Ndala Tshiwis, Boniface Mumbimb Atalatala, Clement N'zau Umba-di-Mbudi
{"title":"Evolution of Sedimentation in a Headrace Canal for Hydroelectric Production Case of the Shongo Basin of the Inga Complex from February 2020 to May 2021 (Kongo Central Province/DR Congo)","authors":"O. K. Kalonda, Ivon Ndala Tshiwis, Boniface Mumbimb Atalatala, Clement N'zau Umba-di-Mbudi","doi":"10.4236/gep.2023.115024","DOIUrl":null,"url":null,"abstract":"The headrace of the Inga hydropower complex is experiencing siltation problems, reducing the exploitable draft and limiting the production capacity of the two main Inga hydropower plants during the low water period. During the 2019 low water period, several sediment slumps occurred in the Shongo basin, disrupting the production of hydroelectric power generated by the Inga 1 & 2 power plant, resulting in massive load shedding of power supply to downstream customers. The cardinal aim of this study is to determine the quantities of sediments deposited and those eroded, in order to know the evolution of sedimentation in the Shongo basin from February 2020 to May 2021. The results obtained show that the running index of the generating units is determinant and influences the sedimentation process in the Shongo basin. The cleaning of the Shongo basin in terms of the spatial distribution of sedimentation from February 2020 to May 2021 is plausible.","PeriodicalId":58477,"journal":{"name":"地球科学和环境保护期刊(英文)","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"地球科学和环境保护期刊(英文)","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.4236/gep.2023.115024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The headrace of the Inga hydropower complex is experiencing siltation problems, reducing the exploitable draft and limiting the production capacity of the two main Inga hydropower plants during the low water period. During the 2019 low water period, several sediment slumps occurred in the Shongo basin, disrupting the production of hydroelectric power generated by the Inga 1 & 2 power plant, resulting in massive load shedding of power supply to downstream customers. The cardinal aim of this study is to determine the quantities of sediments deposited and those eroded, in order to know the evolution of sedimentation in the Shongo basin from February 2020 to May 2021. The results obtained show that the running index of the generating units is determinant and influences the sedimentation process in the Shongo basin. The cleaning of the Shongo basin in terms of the spatial distribution of sedimentation from February 2020 to May 2021 is plausible.
2020年2月至2021年5月因加水电站群松戈盆地引水运河沉积演化研究(刚果中部省/刚果民主共和国)
因加水电站的源头正面临淤积问题,减少了可利用的吃水,限制了两个主要的因加水电站在低潮期的生产能力。2019年低潮期间,松古盆地发生了几次沉积物滑坡,扰乱了因加1和2号发电厂的水力发电,导致下游客户的电力供应大量减少。本次研究的主要目的是确定松古盆地2020年2月至2021年5月的沉积和侵蚀量,以了解松古盆地的沉积演化。结果表明,发电机组的运行指标对松古盆地的沉积过程具有决定性影响。从2020年2月至2021年5月的沉积空间分布来看,松古盆地的清理是有道理的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
860
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信