H. Amsil, A. Jalil, K. Embarch, H. Bounouira, Abdessamad DIDI, K. Laraki, H. Marah, A. Chetaine
{"title":"Conceptual implementation stages for Moroccan PGAA/NI instruments: STAGE I & II","authors":"H. Amsil, A. Jalil, K. Embarch, H. Bounouira, Abdessamad DIDI, K. Laraki, H. Marah, A. Chetaine","doi":"10.3233/JNR-200171","DOIUrl":null,"url":null,"abstract":"The first installation around the tangential beam tube of the Moroccan TRIGA Mark II research reactor comprises combined instruments for Prompt Gamma Neutron Activation Analysis (PGAA) and Neutron Imaging (NI). The implementation of this project is divided over three main stages, namely the installation of the collimator and the primary beam shutter, which is a common section for introduction inside the reactor; the PGAA instruments’ installation; and finally, the installation of the PGNAA/NI combined instruments. The entire design was planned for this project, and detailed information about the first and the second stage is described in this work.","PeriodicalId":44708,"journal":{"name":"Journal of Neutron Research","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Neutron Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3233/JNR-200171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
引用次数: 2
Abstract
The first installation around the tangential beam tube of the Moroccan TRIGA Mark II research reactor comprises combined instruments for Prompt Gamma Neutron Activation Analysis (PGAA) and Neutron Imaging (NI). The implementation of this project is divided over three main stages, namely the installation of the collimator and the primary beam shutter, which is a common section for introduction inside the reactor; the PGAA instruments’ installation; and finally, the installation of the PGNAA/NI combined instruments. The entire design was planned for this project, and detailed information about the first and the second stage is described in this work.
摩洛哥TRIGA Mark II研究堆的切向束流管周围的第一个装置包括快速伽马中子活化分析(PGAA)和中子成像(NI)的组合仪器。本工程的实施分为三个主要阶段,即准直器和主光束百叶窗的安装,主光束百叶窗是反应器内部引入的共同部分;PGAA仪器的安装;最后是PGNAA/NI组合仪器的安装。本设计对整个项目进行了规划,并详细介绍了第一阶段和第二阶段的设计情况。