Study on the Survey Datum Construction for the Middle Route of South-to-North Water Diversion Project

Ding Tao
{"title":"Study on the Survey Datum Construction for the Middle Route of South-to-North Water Diversion Project","authors":"Ding Tao","doi":"10.3724/sp.j.1201.2011.01026","DOIUrl":null,"url":null,"abstract":"Based on a detailed examination on existing survey system in the project area and aimed at the characteristics of the Middle Route of South-to-North Water Diversion Project,a survey datum with multiple levels,,high precision and large range was constructed to meet the project construction requirements.It mainly consists of B-level GPS mainstay networks,C-level GPS networks,second order leveling network for channel route,and construction control network for buildings.It found a way out of incompatibility in time and space between network pointsand provided useful experiences for other similar long-distance projects in terms of survey datum construction method,control grade,technical specifications and data processing.","PeriodicalId":69826,"journal":{"name":"南水北调与水利科技","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2011-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"南水北调与水利科技","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.3724/sp.j.1201.2011.01026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Based on a detailed examination on existing survey system in the project area and aimed at the characteristics of the Middle Route of South-to-North Water Diversion Project,a survey datum with multiple levels,,high precision and large range was constructed to meet the project construction requirements.It mainly consists of B-level GPS mainstay networks,C-level GPS networks,second order leveling network for channel route,and construction control network for buildings.It found a way out of incompatibility in time and space between network pointsand provided useful experiences for other similar long-distance projects in terms of survey datum construction method,control grade,technical specifications and data processing.
南水北调中线工程测量基准建设研究
在详细审查项目区现有测量系统的基础上,针对南水北调中线工程的特点,构建了满足工程建设要求的多层次、高精度、大范围的测量基准。它主要由b级GPS支柱网、c级GPS网、通道路由二级水准网和建筑物施工控制网组成。为解决网点间时空不相容的问题,在测量基准面施工方法、控制等级、技术规范、数据处理等方面为其他类似长距离工程提供了有益的经验。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
4294
期刊介绍: "South-to-North Water Transfers and Water Science and Technology" was founded in 2003, mainly publishing papers on water science, water engineering, water resources, water environment, water management, etc. The journal currently has the following columns: hydrology and water resources, ecology and environment, high-quality development of follow-up projects of South-to-North Water Transfers and construction of national water network, ecological protection and high-quality development of the Yellow River Basin, flood disasters and response, "dual carbon" and water conservancy technology, efficient utilization of agricultural water and soil resources, hydrogeology and engineering geology, etc. The journal is now a Chinese core journal; a source journal for Chinese scientific and technological papers (Chinese core journals); a source journal for the Chinese Science Citation Database (CSCD); and a Chinese core academic journal (A) of RCCSE.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信