Study on the possibility of using artificial pillar to replace the protection coal pillar of the preparation roadways during the mining process at underground coal mines in Quang Ninh region, Vietnam
{"title":"Study on the possibility of using artificial pillar to replace the protection coal pillar of the preparation roadways during the mining process at underground coal mines in Quang Ninh region, Vietnam","authors":"Dinh Van Cuong, Tran Van Thanh, T. Anh","doi":"10.29227/im-2019-02-73","DOIUrl":null,"url":null,"abstract":"The coal reserves in protection pillar of roadways are expected to be left in the mining processin underground mines in Quangninh coal basin which is relatively large (about 16% of the total reserves).If it can be exploited, it will help to save non-renewable coal resources, reduce the cost of preparingroadway meters, extend the mine life and increase the efficiency of construction investment. In the world,in order to reduce coal loss in protection pillar of roadways, mining technology to exploit and use artificialprotection pillars are quite popular. Accordingly, in order to simultaneously exploit coal in the protectionpillar and maintain the transport roadway as a ventilation roadway for the longwall in below level, thepost-mining coal pillar will be replaced by artificial pillars formed from the stone backfill cribs, columns,metal cribs, chemical materials or low-grade concrete mortar mixes formed from fly ash, bottom ash ofthermal power plants, combined crushed waste rock and a cement additive,... This paper will evaluate thepossibility and propose a number of mining technological scheme as well as the type of constructionmaterials suitable for artificial columns.","PeriodicalId":44414,"journal":{"name":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","volume":null,"pages":null},"PeriodicalIF":0.4000,"publicationDate":"2022-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inzynieria Mineralna-Journal of the Polish Mineral Engineering Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29227/im-2019-02-73","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 0
Abstract
The coal reserves in protection pillar of roadways are expected to be left in the mining processin underground mines in Quangninh coal basin which is relatively large (about 16% of the total reserves).If it can be exploited, it will help to save non-renewable coal resources, reduce the cost of preparingroadway meters, extend the mine life and increase the efficiency of construction investment. In the world,in order to reduce coal loss in protection pillar of roadways, mining technology to exploit and use artificialprotection pillars are quite popular. Accordingly, in order to simultaneously exploit coal in the protectionpillar and maintain the transport roadway as a ventilation roadway for the longwall in below level, thepost-mining coal pillar will be replaced by artificial pillars formed from the stone backfill cribs, columns,metal cribs, chemical materials or low-grade concrete mortar mixes formed from fly ash, bottom ash ofthermal power plants, combined crushed waste rock and a cement additive,... This paper will evaluate thepossibility and propose a number of mining technological scheme as well as the type of constructionmaterials suitable for artificial columns.