Ocean energy in Europe

Q3 Engineering
D. Magagna, R. Monfardini, A. Uihlein
{"title":"Ocean energy in Europe","authors":"D. Magagna, R. Monfardini, A. Uihlein","doi":"10.36688/IMEJ.1.1-7","DOIUrl":null,"url":null,"abstract":"The SET-Plan declaration of intent for ocean energy has set ambitious targets for wave and tidal energy technologies. Tidal technologies are expected to reach a levelised cost of energy (LCOE) of 15 cEUR/kWh by 2025. To meet this target, technology costs need to be reduced by about 75 % from 2016 values. Cost-reduction of tidal technologies is expected to go hand in hand with technology deployment and further technology validation gained by the operation of first-of-a-kind tidal farms. In this paper we assess the learning investment needed to support the cost-reduction of tidal energy to meet the 2025 SET-Plan targets. The learning investment necessary to bring tidal energy to cost-competitiveness would be of about EUR 1.45 billion, requiring about 3.2 GW of installed capacity to achieve the LCOE target of 15 cEUR/kWh. Supporting the step growth for the sector requires the design of accompanying policies aimed at the industrialisation of the sector to support the creation of assembly and manufacturing facilities.","PeriodicalId":36111,"journal":{"name":"International Marine Energy Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Marine Energy Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36688/IMEJ.1.1-7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 9

Abstract

The SET-Plan declaration of intent for ocean energy has set ambitious targets for wave and tidal energy technologies. Tidal technologies are expected to reach a levelised cost of energy (LCOE) of 15 cEUR/kWh by 2025. To meet this target, technology costs need to be reduced by about 75 % from 2016 values. Cost-reduction of tidal technologies is expected to go hand in hand with technology deployment and further technology validation gained by the operation of first-of-a-kind tidal farms. In this paper we assess the learning investment needed to support the cost-reduction of tidal energy to meet the 2025 SET-Plan targets. The learning investment necessary to bring tidal energy to cost-competitiveness would be of about EUR 1.45 billion, requiring about 3.2 GW of installed capacity to achieve the LCOE target of 15 cEUR/kWh. Supporting the step growth for the sector requires the design of accompanying policies aimed at the industrialisation of the sector to support the creation of assembly and manufacturing facilities.
欧洲的海洋能源
set - plan海洋能源意向宣言为波浪和潮汐能技术设定了雄心勃勃的目标。到2025年,潮汐技术预计将达到15欧元/千瓦时的平准化能源成本(LCOE)。为了实现这一目标,技术成本需要在2016年的基础上降低约75%。预计潮汐技术的成本降低将与技术部署和首次运营的潮汐农场所获得的进一步技术验证齐头并进。在本文中,我们评估了支持降低潮汐能成本以实现2025年SET-Plan目标所需的学习投资。使潮汐能具有成本竞争力所需的学习投资约为14.5亿欧元,需要约3.2吉瓦的装机容量才能实现15欧元/千瓦时的LCOE目标。为了支持该行业的跨越式增长,需要设计相应的政策,旨在实现该行业的工业化,以支持组装和制造设施的创建。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
International Marine Energy Journal
International Marine Energy Journal Engineering-Ocean Engineering
CiteScore
1.70
自引率
0.00%
发文量
24
审稿时长
12 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信