{"title":"A comparison of different redundancy based methods to solve the project scheduling problem with probabilistic activivies duration","authors":"N. R. Ortiz-Pimiento, Francisco Javier Díaz-Serna","doi":"10.24425/MPER.2019.129600","DOIUrl":null,"url":null,"abstract":"Redundancy based methods are proactive scheduling methods for solving the Project Scheduling Problem (PSP) with non-deterministic activities duration. The fundamental strategy of these methods is to estimate the activities duration by adding extra time to the original duration. The extra time allows to consider the risks that may affect the activities durations and to reduce the number of adjustments to the baseline generated for the project. In this article, four methods based on redundancies were proposed and compared from two robustness indicators. These indicators were calculated after running a simulation process. On the other hand, linear programming was applied as the solution technique to generate the baselines of 480 projects analyzed. Finally, the results obtained allowed to identify the most adequate method to solve the PSP with probabilistic activity duration and generate robust baselines.","PeriodicalId":45454,"journal":{"name":"Management and Production Engineering Review","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management and Production Engineering Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/MPER.2019.129600","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0
Abstract
Redundancy based methods are proactive scheduling methods for solving the Project Scheduling Problem (PSP) with non-deterministic activities duration. The fundamental strategy of these methods is to estimate the activities duration by adding extra time to the original duration. The extra time allows to consider the risks that may affect the activities durations and to reduce the number of adjustments to the baseline generated for the project. In this article, four methods based on redundancies were proposed and compared from two robustness indicators. These indicators were calculated after running a simulation process. On the other hand, linear programming was applied as the solution technique to generate the baselines of 480 projects analyzed. Finally, the results obtained allowed to identify the most adequate method to solve the PSP with probabilistic activity duration and generate robust baselines.
期刊介绍:
Management and Production Engineering Review (MPER) is a peer-refereed, international, multidisciplinary journal covering a broad spectrum of topics in production engineering and management. Production engineering is a currently developing stream of science encompassing planning, design, implementation and management of production and logistic systems. Orientation towards human resources factor differentiates production engineering from other technical disciplines. The journal aims to advance the theoretical and applied knowledge of this rapidly evolving field, with a special focus on production management, organisation of production processes, management of production knowledge, computer integrated management of production flow, enterprise effectiveness, maintainability and sustainable manufacturing, productivity and organisation, forecasting, modelling and simulation, decision making systems, project management, innovation management and technology transfer, quality engineering and safety at work, supply chain optimization and logistics. Management and Production Engineering Review is published under the auspices of the Polish Academy of Sciences Committee on Production Engineering and Polish Association for Production Management.