Results from the Danish High Temperature Superconducting Power Cable Project

J. Østergaard, O. Tønnesen
{"title":"Results from the Danish High Temperature Superconducting Power Cable Project","authors":"J. Østergaard, O. Tønnesen","doi":"10.2221/JCSJ.37.450","DOIUrl":null,"url":null,"abstract":"For the first time, a high temperature superconducting (HTS) demonstration cable system has been installed in a utility network supplying electricity to consumers. The cable is a 30-m long, 30kVrms, 2, 000Arms cable, installed in the network of Copenhagen Energy at a substation supplying approximately 50, 000 customers. The purpose of the cable installation is to obtain installation and operating experience with this type of cable. The cable system has been in operation since May 28th 2001, and the first operating experiences of the cable have been satisfactory. The cable has been in operation for more than one year, and the cable has during the first year supplied 101, 000MWh of energy to the customers.","PeriodicalId":93144,"journal":{"name":"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]","volume":"37 1","pages":"450-456"},"PeriodicalIF":0.0000,"publicationDate":"2002-09-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teion kogaku = Cryogenic engineering : [official journal of the Cryogenic Association of Japan]","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2221/JCSJ.37.450","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

Abstract

For the first time, a high temperature superconducting (HTS) demonstration cable system has been installed in a utility network supplying electricity to consumers. The cable is a 30-m long, 30kVrms, 2, 000Arms cable, installed in the network of Copenhagen Energy at a substation supplying approximately 50, 000 customers. The purpose of the cable installation is to obtain installation and operating experience with this type of cable. The cable system has been in operation since May 28th 2001, and the first operating experiences of the cable have been satisfactory. The cable has been in operation for more than one year, and the cable has during the first year supplied 101, 000MWh of energy to the customers.
丹麦高温超导电力电缆工程成果
高温超导(HTS)示范电缆系统首次安装在向消费者供电的公用事业网络中。该电缆是一条30米长、30kVrms、2000臂的电缆,安装在哥本哈根能源公司的变电站网络中,为大约5万名客户提供电力。电缆安装的目的是获取该类型电缆的安装和操作经验。该电缆系统自2001年5月28日开始运行,首次运行经验令人满意。该电缆已运行一年多,第一年为客户提供了10.1万兆瓦时的能源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信