{"title":"Instrumentation at Changi land reclamation project, Singapore","authors":"A. Arulrajah, M. W. Bo, J. Chu, H. Nikraz","doi":"10.1680/GENG.2009.162.1.33","DOIUrl":null,"url":null,"abstract":"Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpi...","PeriodicalId":45150,"journal":{"name":"Geotechnical Engineering","volume":"24 1","pages":"33-40"},"PeriodicalIF":0.3000,"publicationDate":"2009-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1680/GENG.2009.162.1.33","citationCount":"33","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/GENG.2009.162.1.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 33
Abstract
Ground improvement is often required in land reclamation projects on soft soil deposits to reduce future settlement under the projected future dead and live loads. In the case of thick deposits of marine clay, it is often necessary to accelerate the consolidation process of the clay using prefabricated vertical drains. In such projects, the degree of improvement has to be ascertained to confirm whether the soil has achieved the required degree of consolidation before the removal of surcharge. This analysis can be carried out by means of observational methods for which the ground behaviour is continuously monitored from the date of instrument installation. This paper provides a case study of the applications of geotechnical instrumentation for construction control in the Changi East reclamation project in the Republic of Singapore. Field instruments adopted in this project included settlement plates, deep settlement gauges, earth pressure cells, pneumatic piezometers, electric piezometers and water standpi...
期刊介绍:
The objectives of the Association shall be the promotion of co-operation among geotechnical societies in SE Asia; and the assistance to member societies who have limited number of members. Now there is only one combined web titled: AGSSEA-SEAGS. SEAGS & AGSSEA encourage the submission of scholarly and practice-oriented articles to its journal. The journal is published quarterly. Both sponsors of the journal, the Southeast Asian Geotechnical Society and the Association of Geotechnical Societies in Southeast Asia, promote the ideals and goals of the International Society of Soil Mechanics and Geotechhnical Engineering in fostering communications, developing insights and enabling the advancement of the geotechnical engineering discipline.