THE CAPACITY OF THE SANNA RIVER IN CONDITIONS OF THE RELIABLE FLOW AND THE CONTROL DISCHARGES OF THE WEIR IN ZAKLIKÓW

B. Michalec
{"title":"THE CAPACITY OF THE SANNA RIVER IN CONDITIONS OF THE RELIABLE FLOW AND THE CONTROL DISCHARGES OF THE WEIR IN ZAKLIKÓW","authors":"B. Michalec","doi":"10.15576/GLL/2021.1.57","DOIUrl":null,"url":null,"abstract":"The aim of the study was to determine the capacity of a selected section of the Sanna river, designated below the lower site of the weir in Zaklików. The capacity calculations included the conditions of flood water discharge, i.e. the reliable flow and the control flow, determined in accordance with the Regulation of the Minister of the Environment on technical conditions that should be ensured for the hydrotechnical structures and their locations. The paper presents the consequences of changes in the regulations regarding the determination of building type, for which reliable flow and control discharges are determined. These modifications in the regulations have an impact on changes in the determination of the probability value for water discharges related to the analysed weir. The calculation of the capacity of the tested section also took into account its technical condition, specifying the variant of calculations for the lack of maintenance works, i.e. for the current state and for the state after maintenance works, consisting in mowing vegetation on slopes and shaping the surface of river bottom, removing pits and shallows. The results of the calculations of capacity of the measured cross-sections showed that the performance of maintenance works will convey the flow of a Q3% reliable flow in the Sanna river, while the Q1% control flow will not fit into the riverbed and will cause inundation of the adjacent areas.","PeriodicalId":31423,"journal":{"name":"Geomatics Landmanagement and Landscape","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomatics Landmanagement and Landscape","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15576/GLL/2021.1.57","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The aim of the study was to determine the capacity of a selected section of the Sanna river, designated below the lower site of the weir in Zaklików. The capacity calculations included the conditions of flood water discharge, i.e. the reliable flow and the control flow, determined in accordance with the Regulation of the Minister of the Environment on technical conditions that should be ensured for the hydrotechnical structures and their locations. The paper presents the consequences of changes in the regulations regarding the determination of building type, for which reliable flow and control discharges are determined. These modifications in the regulations have an impact on changes in the determination of the probability value for water discharges related to the analysed weir. The calculation of the capacity of the tested section also took into account its technical condition, specifying the variant of calculations for the lack of maintenance works, i.e. for the current state and for the state after maintenance works, consisting in mowing vegetation on slopes and shaping the surface of river bottom, removing pits and shallows. The results of the calculations of capacity of the measured cross-sections showed that the performance of maintenance works will convey the flow of a Q3% reliable flow in the Sanna river, while the Q1% control flow will not fit into the riverbed and will cause inundation of the adjacent areas.
在可靠流量和zaklikÓw堰控制流量条件下的桑纳河容量
这项研究的目的是确定萨那河选定的一段河段的容量,该河段位于Zaklików中堰的较低位置以下。容量计算包括洪水泄洪条件,即可靠流量和控制流量,根据环境部关于水工设施及其位置应确保的技术条件的规定确定。本文介绍了有关确定建筑类型的规定的变化的后果,为确定可靠的流量和控制排放。条例的这些修改对与所分析的堰有关的水排放概率值的确定产生了影响。试验断面承载力的计算也考虑了其技术条件,明确了不进行养护工程时的计算形式,即养护工程完成后的计算形式,即对边坡上的植被进行修剪,对河底表面进行修整,对坑洞和浅滩进行清除。实测断面运力计算结果表明,维护工程的实施将向桑那河输送Q3%的可靠流量,而Q1%的控制流量将不适应河床,并造成邻近地区的淹没。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
7
审稿时长
30 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信