Supply Chain Performance Measurement at High Rise Building Construction Using SCOR Method Approach (Supply Chain Operations Reference)

Taufiq Fitrianto, M. Wibowo, J. Hatmoko
{"title":"Supply Chain Performance Measurement at High Rise Building Construction Using SCOR Method Approach (Supply Chain Operations Reference)","authors":"Taufiq Fitrianto, M. Wibowo, J. Hatmoko","doi":"10.14710/mkts.v26i1.26064","DOIUrl":null,"url":null,"abstract":"Construction industry has a vital role in Indonesia’s economic growth. Infrastructure projects have been the priorities in the past five years consistent with RPJMN (National Medium Term Development Plan). It’s evident in the percentage of contribution of the construction industry, i.e. 10.2%, to Gross Domestic Product (PDB) and 6.34 million employments (5.3% national labors). However, it isn’t followed by efficiency of the construction industry. Increased cost, implementation, delay, conflict and dispute are some problems which arise from fragmentation and causes the construction industry to be known as an inefficient industry. A possible approach to solve fragment problem is studying the supply chain of the construction industry. The present study aimed to measure supply chain performance of construction using SCOR (supply chain) method, the impact and mitigation. The result was that the handling performed in TSM Bali project resulted in 5.56% of indirect waste, 8.63% of direct waste, and 443,711 tonCO2 of carbon footprint","PeriodicalId":31880,"journal":{"name":"Media Komunikasi Teknik Sipil","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Komunikasi Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/mkts.v26i1.26064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction industry has a vital role in Indonesia’s economic growth. Infrastructure projects have been the priorities in the past five years consistent with RPJMN (National Medium Term Development Plan). It’s evident in the percentage of contribution of the construction industry, i.e. 10.2%, to Gross Domestic Product (PDB) and 6.34 million employments (5.3% national labors). However, it isn’t followed by efficiency of the construction industry. Increased cost, implementation, delay, conflict and dispute are some problems which arise from fragmentation and causes the construction industry to be known as an inefficient industry. A possible approach to solve fragment problem is studying the supply chain of the construction industry. The present study aimed to measure supply chain performance of construction using SCOR (supply chain) method, the impact and mitigation. The result was that the handling performed in TSM Bali project resulted in 5.56% of indirect waste, 8.63% of direct waste, and 443,711 tonCO2 of carbon footprint
基于SCOR方法的高层建筑施工供应链绩效评估(供应链运营参考)
建筑业在印尼的经济增长中起着至关重要的作用。根据国家中期发展计划,基础设施项目是过去五年的优先事项。建筑业对国内生产总值(PDB)的贡献比例为10.2%,就业人数为634万人(全国劳动力的5.3%)。然而,建筑业的效率并没有随之提高。由于碎片化而产生的成本增加、实施延误、冲突和纠纷等问题,使得建筑业被称为低效行业。研究建筑行业的供应链是解决碎片化问题的一个可能途径。本研究旨在运用供应链(SCOR)方法测量建筑供应链绩效、影响与缓解。结果表明,TSM巴厘岛项目的处理产生了5.56%的间接废物和8.63%的直接废物,产生了443,711吨的二氧化碳碳足迹
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书