Comparison of methodologies for design peak discharge estimation in selected catchments of Bosnia and Herzegovina

IF 1 4区 工程技术 Q4 ENGINEERING, CIVIL
Gradevinar Pub Date : 2019-09-01 DOI:10.14256/jce.2611.2019
Željko Lozančić
{"title":"Comparison of methodologies for design peak discharge estimation in selected catchments of Bosnia and Herzegovina","authors":"Željko Lozančić","doi":"10.14256/jce.2611.2019","DOIUrl":null,"url":null,"abstract":"Some usual hydrological methods and the hydrological model EBA4SUB are used in the paper to determine the design peak discharge for various return periods for catchments in Bosnia and Herzegovina. The aim of the paper is to test for the first time the EBA4SUB model in the selected catchments. The results obtained by the EBA4SUB model compare well with other related methods. The advantages of the model lie in the fact that it takes into account physical processes taking place in the catchment, influencing formation of surface runoff.","PeriodicalId":50415,"journal":{"name":"Gradevinar","volume":"1 1","pages":""},"PeriodicalIF":1.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gradevinar","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14256/jce.2611.2019","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 4

Abstract

Some usual hydrological methods and the hydrological model EBA4SUB are used in the paper to determine the design peak discharge for various return periods for catchments in Bosnia and Herzegovina. The aim of the paper is to test for the first time the EBA4SUB model in the selected catchments. The results obtained by the EBA4SUB model compare well with other related methods. The advantages of the model lie in the fact that it takes into account physical processes taking place in the catchment, influencing formation of surface runoff.
波斯尼亚和黑塞哥维那选定流域设计峰值流量估算方法的比较
本文采用常用的水文方法和水文模型EBA4SUB,确定了波黑流域不同回潮期的设计洪峰流量。本文的目的是在选定的流域中首次对EBA4SUB模型进行测试。EBA4SUB模型得到的结果与其他相关方法的结果比较好。该模型的优点在于它考虑了流域中发生的影响地表径流形成的物理过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Gradevinar
Gradevinar ENGINEERING, CIVIL-
CiteScore
1.70
自引率
18.20%
发文量
56
审稿时长
6-12 weeks
期刊介绍: Information not localized
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信