Impact of funding on cost-time aspects of public and social buildings

IF 1 4区 工程技术 Q4 ENGINEERING, CIVIL
Gradevinar Pub Date : 2019-01-08 DOI:10.14256/jce.2205.2017
K. Tijanić, D. Car-Pušić, Ksenija Čulo
{"title":"Impact of funding on cost-time aspects of public and social buildings","authors":"K. Tijanić, D. Car-Pušić, Ksenija Čulo","doi":"10.14256/jce.2205.2017","DOIUrl":null,"url":null,"abstract":"The comparison of the traditional (budget-funded) public building procurement model with the public private partnership (non-budget funded) model is presented in the paper. Public service buildings procured based on the traditional model and those procured according to the PPP model are compared in the scope of research involving nine buildings realized in the Republic of Croatia. The results point to greater efficiency of the PPP model in the construction of public service buildings, with regard to both cost and time of construction work.","PeriodicalId":50415,"journal":{"name":"Gradevinar","volume":null,"pages":null},"PeriodicalIF":1.0000,"publicationDate":"2019-01-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gradevinar","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14256/jce.2205.2017","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 3

Abstract

The comparison of the traditional (budget-funded) public building procurement model with the public private partnership (non-budget funded) model is presented in the paper. Public service buildings procured based on the traditional model and those procured according to the PPP model are compared in the scope of research involving nine buildings realized in the Republic of Croatia. The results point to greater efficiency of the PPP model in the construction of public service buildings, with regard to both cost and time of construction work.
资金对公共和社会建筑成本-时间方面的影响
本文对传统的(预算资助)公共建筑采购模式与公私合作(非预算资助)模式进行了比较。本文以克罗地亚共和国的9栋建筑为研究对象,对基于传统模式和PPP模式采购的公共服务建筑进行比较。研究结果表明,PPP模式在公共服务建筑的建设中具有更高的效率,无论是在成本方面还是在施工时间方面。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
Gradevinar
Gradevinar ENGINEERING, CIVIL-
CiteScore
1.70
自引率
18.20%
发文量
56
审稿时长
6-12 weeks
期刊介绍: Information not localized
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信