Li Cailin, Chao Wang, Junchao Li, Qiaoya Liu, Xiaoju Wu, Ping Yang
{"title":"Function-based scheduling method on initial identified water level of reservoir long-term optimal scheduling","authors":"Li Cailin, Chao Wang, Junchao Li, Qiaoya Liu, Xiaoju Wu, Ping Yang","doi":"10.1504/IJMSI.2015.075831","DOIUrl":null,"url":null,"abstract":"In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.","PeriodicalId":39035,"journal":{"name":"International Journal of Materials and Structural Integrity","volume":"9 1","pages":"254"},"PeriodicalIF":0.0000,"publicationDate":"2015-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1504/IJMSI.2015.075831","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Materials and Structural Integrity","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJMSI.2015.075831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0
Abstract
In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.