Optimation Budgeting DistributionModel for Maintaining Irrigation Scheme

Sutarto Edhisono, I. K. Hadihardaja, S. Suripin
{"title":"Optimation Budgeting DistributionModel for Maintaining Irrigation Scheme","authors":"Sutarto Edhisono, I. K. Hadihardaja, S. Suripin","doi":"10.12777/IJSE.10.1.35-44","DOIUrl":null,"url":null,"abstract":"Utilization of palm oil  by-product such as palm fronds, leaves, empty fruit bunches (EFB), fiber fruit juice (FFJ), palm to maintenance of irrigation structures are the activities carried out routinely in irrigation areas in order to obtain optimum performance. Required costs of maintenance is provided by government based on the commanding area of irrigation area without taking into account the characteristics of each irrigation area. On the other hand the fund which is provided by the government for the purpose of maintenance of irrigation assets amounting to 40 % of the required, so that necessary special tips is needed to take optimum result of the limited funds to choose which priority irrigation structures. While this selection irrigation structures are maintained/repaired just based on policy of decision makers only. The purpose of this research was to develop an optimization model for distribution of irrigation maintenance cost allocation for the irrigation areas and  make selection to priority irrigation structures for maintenance in order to get optimum results. Location of the research is the  Pondok Irrigation Area (IA) which located in East Java province. This irrigation area  is part of the region Central River Region Solo. Pondok IA. consist of 4 irrigation areas, namely: Dero IA., Sambiroto IA., Padas IA. And Plesungan IA. The study was conducted in two stages : Stage 1 with the aim of allocating the cost of maintenance for each irrigation area in Pondok  IA., which are Dero IA., Sambiroto IA., Padas IA. And Plesungan IA. Stage 2 with the aim of making choice for the priority irrigation structures are maintained/repaired on Dero IA.,  Sambiroto IA., Padas IA. And Plesungan IA. The method used is multi criteria analysis by Analytical Hierarchy Process (AHP) with using a soft ware expert choice 2000. To complete Stage 1used multiple criteria analysis of three levels, with the top level is Pondok IA., then the second level is below, named  criterias which consists of four criterias, namely: Level of Urgency, Productivity, Commanding Area and Cost with in ratio of 4: 3: 2: 1. The lowest level  is named alternatives which consisted of four irrigation areas, namely Dero IA., Sambiroto IA., Padas IA., and Plesungan IA. The data used in this research is PAI Solo data in 2011. Stage 2 of this study is selection priority structures in each irrigation area for maintenance / repair. In this analisis is used multi-criteria analysis  also, where as the top level is the name of each irrigation area. As  criteria there are three criterias, namely: Productivity, Service area, Cost of structure with the weight of each: 3: 2: 1. As the lower level is alternative, which here are the name of the proposed structures. The proposed structures and their specifications are taken from PAI Bengawan Solo data in 2011. The structures which analysed are the structures which in very urgent and urgent condition only. The result is a list of priority irrigation structures which would be maintained from each irrigation area. Results of the  research Stage 1 : From costs available for Pondok  IA.  IDR 749,880,000.-. Dero IA., receive IDR 216,715,320.-; Sambiroto IA., receive IDR 207,716,760.-; Padas IA., receive IDR 173,222,280.-; and Plesungan IA., receive IDR 151,475,760.-. Results of the Stage 2 study is priority structures which would be maintained on each irrigation areas, namely: Dero IA., the name of the structures are: SSDOKa11, BDOKi1, BDOKa6, BDOKa15, SSDOKa14, SSDOKa15, SSDOKa17, SSDOKi1, SSDOKi2","PeriodicalId":14209,"journal":{"name":"International Journal of Science and Engineering","volume":"33 1","pages":"35-44"},"PeriodicalIF":0.0000,"publicationDate":"2016-01-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12777/IJSE.10.1.35-44","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Utilization of palm oil  by-product such as palm fronds, leaves, empty fruit bunches (EFB), fiber fruit juice (FFJ), palm to maintenance of irrigation structures are the activities carried out routinely in irrigation areas in order to obtain optimum performance. Required costs of maintenance is provided by government based on the commanding area of irrigation area without taking into account the characteristics of each irrigation area. On the other hand the fund which is provided by the government for the purpose of maintenance of irrigation assets amounting to 40 % of the required, so that necessary special tips is needed to take optimum result of the limited funds to choose which priority irrigation structures. While this selection irrigation structures are maintained/repaired just based on policy of decision makers only. The purpose of this research was to develop an optimization model for distribution of irrigation maintenance cost allocation for the irrigation areas and  make selection to priority irrigation structures for maintenance in order to get optimum results. Location of the research is the  Pondok Irrigation Area (IA) which located in East Java province. This irrigation area  is part of the region Central River Region Solo. Pondok IA. consist of 4 irrigation areas, namely: Dero IA., Sambiroto IA., Padas IA. And Plesungan IA. The study was conducted in two stages : Stage 1 with the aim of allocating the cost of maintenance for each irrigation area in Pondok  IA., which are Dero IA., Sambiroto IA., Padas IA. And Plesungan IA. Stage 2 with the aim of making choice for the priority irrigation structures are maintained/repaired on Dero IA.,  Sambiroto IA., Padas IA. And Plesungan IA. The method used is multi criteria analysis by Analytical Hierarchy Process (AHP) with using a soft ware expert choice 2000. To complete Stage 1used multiple criteria analysis of three levels, with the top level is Pondok IA., then the second level is below, named  criterias which consists of four criterias, namely: Level of Urgency, Productivity, Commanding Area and Cost with in ratio of 4: 3: 2: 1. The lowest level  is named alternatives which consisted of four irrigation areas, namely Dero IA., Sambiroto IA., Padas IA., and Plesungan IA. The data used in this research is PAI Solo data in 2011. Stage 2 of this study is selection priority structures in each irrigation area for maintenance / repair. In this analisis is used multi-criteria analysis  also, where as the top level is the name of each irrigation area. As  criteria there are three criterias, namely: Productivity, Service area, Cost of structure with the weight of each: 3: 2: 1. As the lower level is alternative, which here are the name of the proposed structures. The proposed structures and their specifications are taken from PAI Bengawan Solo data in 2011. The structures which analysed are the structures which in very urgent and urgent condition only. The result is a list of priority irrigation structures which would be maintained from each irrigation area. Results of the  research Stage 1 : From costs available for Pondok  IA.  IDR 749,880,000.-. Dero IA., receive IDR 216,715,320.-; Sambiroto IA., receive IDR 207,716,760.-; Padas IA., receive IDR 173,222,280.-; and Plesungan IA., receive IDR 151,475,760.-. Results of the Stage 2 study is priority structures which would be maintained on each irrigation areas, namely: Dero IA., the name of the structures are: SSDOKa11, BDOKi1, BDOKa6, BDOKa15, SSDOKa14, SSDOKa15, SSDOKa17, SSDOKi1, SSDOKi2
维持灌溉方案的优化预算分配模型
利用棕榈油副产品,如棕榈叶,空果束(EFB),纤维果汁(FFJ),棕榈维持灌溉结构是灌区常规进行的活动,以获得最佳性能。所需的维护费用由政府根据灌区的指挥面积提供,没有考虑到每个灌区的特点。另一方面,政府提供的用于灌溉资产维护的资金占所需资金的40%,因此需要必要的特殊提示,以便在有限的资金中选择优先灌溉结构的最佳效果。而这种选择灌溉结构的维持/修复仅仅是基于决策者的政策。本研究的目的是建立灌区灌溉维修费用分配的优化模型,选择优先维修的灌溉结构,以获得最优的维修效果。研究地点是位于东爪哇省的Pondok灌溉区(IA)。这个灌溉区是该地区中央河流索罗区的一部分。Pondok IA。由4个灌区组成,分别是:Sambiroto IA。Padas IA。还有plessungan IA。该研究分两个阶段进行:第一阶段的目的是分配Pondok IA每个灌区的维护成本。,即Dero IA。Sambiroto IA。Padas IA。还有plessungan IA。第二阶段的目的是选择优先的灌溉结构,在德罗IA上进行维护/维修。Sambiroto IA。Padas IA。还有plessungan IA。采用层次分析法(AHP)进行多准则分析,并利用软件专家选择2000。为了完成第一阶段,使用了三个级别的多标准分析,其中最高级别是Pondok IA。,则第二层为标准,由紧急程度、生产力、指挥区域和成本四个标准组成,比例为4:3:2:1。最低一级为备选区,由四个灌区组成,即Dero IA。Sambiroto IA。Padas IA。和plessungan IA。本研究使用的数据为2011年PAI Solo数据。本研究的第二阶段是在每个灌区选择优先维护/维修的结构。在此分析中还使用了多标准分析,其中顶层是每个灌区的名称。作为标准有三个标准,即:生产率,服务面积,结构成本,各权重:3:2:1。由于较低的层次是可选的,这里是拟议结构的名称。所建议的结构及其规格取自2011年PAI Bengawan Solo数据。所分析的结构是处于非常紧急和紧急状态的结构。结果是一个优先灌溉结构的列表,将从每个灌区维护。研究结果第一阶段:从Pondok IA的可用成本。IDR 749880000。-。德洛IA。收到216,715,320印尼盾。-;Sambiroto IA。,收到207,716,760印尼卢比。-;篇IA。,收到印尼盾173,222,280。-;和plessungan IA。,收到印尼盾151,475,760。第二阶段研究的结果是将在每个灌区维持优先结构,即:Dero IA。,结构名分别为:SSDOKa11、BDOKi1、BDOKa6、BDOKa15、SSDOKa14、SSDOKa15、SSDOKa17、SSDOKi1、SSDOKi2
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信